Building Energy Storage Simulation

Documentation Status

isolated

The Building Energy Storage Simulation serves as OpenAI gym (now gymnasium) environment for Reinforcement Learning. The environment represents a building with an energy storage (in form of a battery) and a solar energy system. The building is connected to a power grid with time varying electricity prices. The task is to control the energy storage so that the total cost of electricity are minimized.

The inspiration of this project and the data profiles come from the CityLearn environment. Anyhow, this project focuses on the ease of usage and the simplicity of its implementation. Therefore, this project serves as playground for those who want to get started with reinforcement learning for energy management system control.

Installation

By using pip just:

pip install building-energy-storage-simulation

or if you want to continue developing the package:

git clone https://github.com/tobirohrer/building-energy-storage-simulation.git && cd building-energy-storage-simulation
pip install -e .[docs,tests]

Contribute & Contact

As I just started with this project, I am very happy for any kind of contribution! In case you want to contribute, or if you have any questions, contact me via discord.

Usage

from building_energy_storage_simulation import Environment, BuildingSimulation

simulation = BuildingSimulation()
env = Environment(building_simulation=simulation)

env.reset()
env.step(1)
...

Important note: This environment is implemented by using gymnasium (the proceeder of OpenAI gym). Meaning, if you are using a reinforcement learning library like Stable Baselines3 make sure it supports gymnasium environments.

Task Description

The simulation contains a building with an energy load profile attached to it. The load is always automatically covered by

  • primarily using electricity generated by the solar energy system,
  • and secondary by using the remaining required electricity "from the grid"

When energy is taken from the grid, costs are incurred that can vary depending on the time (if a price profile is passed as electricity_price to BuildingSimulation). The simulated building contains a battery which be controlled by charging and discharging energy. The goal is to find control strategies optimize the use of the energy storage by e.g. charging whenever electricity prices are high or whenever there is a surplus of solar generation. It is important to note that no energy can be fed into the grid. This means any surplus of solar energy which is not used to charge the battery is considered lost.

Reward

$$ r_t = -1 * electricity_consumed_t * electricity_price_t$$

Note, that the term electricity_consumed cannot be negative. This means, excess energy from the solar energy system which is not consumed by the electricity load or by charging the battery is considered lost (electricity_consumed is 0 in this case).

Action Space

Action Min Max
Charge -1 1

The actions lie in the interval of [-1;1]. The action represents a fraction of the maximum energy which can be retrieved from the battery (or used to charge the battery) per time step.

  • 1 means maximum charging the battery. The maximum charge per time step is defined by the parameter max_battery_charge_per_timestep.
  • -1 means maximum discharging the battery, meaning "gaining" electricity out of the battery
  • 0 means don't charge or discharge

Observation Space

Index Observation Min Max
0 State of Charge (in kWh) 0 battery_capacity
[1; n] Forecast Electric Load (in kWh) Min of Load Profile Max of Load Profile
[n+1; 2*n] Forecast Solar Generation (in kWh) Min of Generation Profile Max of Generation Profile
[2n+1; 3*n] Electricity Price (in € cent per kWh) Min of Price Profile Max of Price Profile

The length of the observation depends on the length of the forecast ($$n$$) used. By default, the simulation uses a forecast length of 4. This means 4 time steps of an electric load forecast, 4 time steps of a solar generation forecast and 4 time steps of the electric price profile are included in the observation. In addition to that, the information about the current state of charge of the battery is contained in the observation.

The length of the forecast can be defined by setting the parameter num_forecasting_steps of the Environment().

Episode Ends

The episode ends if the max_timesteps of the Environment() are reached.

Code Documentation

The documentation is available at https://building-energy-storage-simulation.readthedocs.io/

Project details


Download files

Download the file for your platform. If you're not sure which to choose, learn more about installing packages.

Source Distribution

building_energy_storage_simulation-0.8.0.tar.gz (228.7 kB view hashes)

Uploaded Source

Built Distribution

Supported by

AWS AWS Cloud computing and Security Sponsor Datadog Datadog Monitoring Fastly Fastly CDN Google Google Download Analytics Microsoft Microsoft PSF Sponsor Pingdom Pingdom Monitoring Sentry Sentry Error logging StatusPage StatusPage Status page