Skip to main content

Open Generation and Transmission Operation and Expansion Planning Model with RES and ESS (openTEPES) - March 31, 2021

Project description


.. image:: https://raw.githubusercontent.com/IIT-EnergySystemModels/openTEPES/1e6d907114d2e89a7114ef58dead3c55bc6e7d50/doc/img/openTEPES.png
:target: https://pascua.iit.comillas.edu/aramos/openTEPES/index.html
:alt: logo
:align: center

|

.. image:: https://badge.fury.io/py/openTEPES.svg
:target: https://badge.fury.io/py/openTEPES
:alt: PyPI

.. image:: https://img.shields.io/pypi/pyversions/openTEPES.svg
:target: https://pypi.python.org/pypi/openTEPES
:alt: versions

.. image:: https://img.shields.io/readthedocs/opentepes
:target: https://opentepes.readthedocs.io/en/latest/index.html
:alt: docs

.. image:: https://img.shields.io/badge/License-GPL%20v3-blue.svg
:target: https://github.com/IIT-EnergySystemModels/openTEPES/blob/master/LICENSE
:alt: GPL

.. image:: https://pepy.tech/badge/openTEPES
:target: https://pepy.tech/project/openTEPES
:alt: pepy

**Open Generation and Transmission Operation and Expansion Planning Model with RES and ESS (openTEPES)**

*Simplicity and Transparency in Power Systems Planning*

The openTEPES model has been developed at the `Instituto de Investigación Tecnológica (IIT) <https://www.iit.comillas.edu/index.php.en>`_ of the `Universidad Pontificia Comillas <https://www.comillas.edu/en/>`_.

**openTEPES** determines the investment plans of new facilities (generators, ESS and lines)
for supplying the forecasted demand at minimum cost. Tactical planning is concerned with time horizons of 10-20 years. Its objective is to evaluate the future generation, storage and network needs.
The main results are the guidelines for the future structure of the generation and transmission systems.

The **openTEPES** model presents a decision support system for defining the generation and transmission expansion plan of a large-scale electric system at a tactical level,
defined as a set of generation and network investment decisions for future years. The expansion candidate, generators, ESS and lines, are pre-defined by the user, so the model determines
the optimal decisions among those specified by the user.

It determines automatically optimal expansion plans that satisfy simultaneously several attributes. Its main characteristics are:

- **Static**: the scope of the model corresponds to a single year at a long-term horizon, 2030 or 2040 for example.

It represents hierarchically the different time scopes to take decisions in an electric system:

- Period: one year
- Load level: 2030-01-01T00:00:00+01:00 to 2030-12-30T23:00:00+01:00

The time division allows a flexible representation of the periods for evaluating the system operation. Additionally, it can be run with chronological periods of several consecutive hours (bi-hourly, tri-hourly resolution)
to allow decreasing the computational burden without accuracy loss.

- **Stochastic**: several stochastic parameters that can influence the optimal generation and transmission expansion decisions are considered. The model considers stochastic
medium-term yearly uncertainties (scenarios) related to the system operation. These operation scenarios are associated with renewable energy sources and electricity demand.

The objective function incorporates the two main quantifiable costs: **generation and transmission investment cost (CAPEX)** and **expected variable operation costs (including generation emission and reliability costs) (system OPEX)**.

The model formulates a stochastic optimization problem including generation and network binary investment decisions and operation decisions (commitment, startup and shutdown decisions are also binary).

The operation model is a **network constrained unit commitment (NCUC)** based on a **tight and compact** formulation including operating reserves with a
**DC power flow (DCPF)**. Network ohmic losses are considered proportional to the line flow. It considers different **energy storage systems (ESS)**, e.g., pumped-storage hydro,
battery, etc. It allows analyzing the trade-off between the investment in generation/transmission and the investment or use of storage capacity.

The main results of the model can be structured in these topics:

- **Investment**: investment decisions and cost
- **Operation**: the output of different units and aggregation by technologies (thermal, storage hydro, pumped-storage hydro, RES), RES curtailment, line flows, line ohmic losses, node voltage angles
- **Emissions**: CO2 emissions by unit
- **Marginal**: Locational Short-Run Marginal Costs (LSRMC)

A careful implementation has been done to avoid numerical problems by scaling parameters, variables and equations of the optimization problem allowing the model to be used for large-scale cases, e.g., the European system with hourly detail.

Installation
############
There are 2 ways to get all required packages under Windows. We recommend using the Python distribution Anaconda. If you don't want to use it or already have an existing Python (version 3.8 **recommended**, 2.7 is supported as well) installation, you can also download the required packages by yourself.


Miniconda (recommended)
=======================
1. `Miniconda <https://docs.conda.io/en/latest/miniconda.html>`_. Choose the 64-bit installer if possible.

1. During the installation procedure, keep both checkboxes "modify the PATH" and "register Python" selected! If only higher Python versions are available, you can switch to a specific Python Version by typing ``conda install python=<version>``
2. **Remark:** if Anaconda or Miniconda was installed previously, please check that python is registered in the environment variables.
2. **Packages and Solver**:

1. Launch a new command prompt (Windows: Win+R, type "cmd", Enter)
2. Install `GLPK <http://winglpk.sourceforge.net/>`_ and `Cartopy <https://pypi.org/project/Cartopy/>`_ via conda by ``conda install glpk cartopy``
3. Install openTEPES via pip by ``pip install openTEPES``

Continue at `Get Started <#get-started>`_.


GitHub Repository (the hard way)
================================
1. Clone the `openTEPES <https://github.com/IIT-EnergySystemModels/openTEPES/tree/master>`_ repository.
2. Launch the command prompt (Windows: Win+R, type "cmd", Enter), or the Anaconda prompt
3. Set up the path by ``cd "C:\Users\<username>\...\openTEPES"``. (Note that the path is where the repository was cloned.)
4. Install openTEPES via pip by ``pip install .``


Get started
###########

Developers
==========
By cloning the `openTEPES <https://github.com/IIT-EnergySystemModels/openTEPES/tree/master>`_ repository, you can create branches and propose pull-request. Any help will be very appreciated.

Continue like the users for a simple way of executions.

Users
=====

If you are not planning on developing, please follows the instructions of the [Installation](#installation).

Once installation is complete, `openTEPES <https://github.com/IIT-EnergySystemModels/openTEPES/tree/master>`_ can be executed in a test mode by using a command prompt.
In the directory of your choice, open and execute the openTEPES_run.py script by using the following on the command prompt (Windows) or Terminal (Linux). (Depending on what your standard python version is, you might need to call `python3` instead of `python`.):

``openTEPES_Main``

Then, three parameters (case, dir, and solver) will be asked for.

**Remark:** at this step only press enter for each input and openTEPES will be executed with the default parameters.

After this in a directory of your choice, make a copy of the `9n <https://github.com/IIT-EnergySystemModels/openTEPES/tree/master/openTEPES/9n>`_ or `sSEP <https://github.com/IIT-EnergySystemModels/openTEPES/tree/master/openTEPES/sSEP>`_ case to create a new case of your choice but using the current format of the CSV files.
A proper execution by ``openTEPES_Main`` can be made by introducing the new case and the directory of your choice. Note that the solver is **glpk** by default, but it can be changed by other solvers that pyomo supports (e.g., gurobi, mosek).

Then, the **results** should be written in the folder who is called with the case name. The results contain plots and summary spreadsheets for multiple optimised energy scenarios, periods and load levels as well as the investment decisions.

**Note that** there is an alternative way to run the model by creating a new script **script.py**, and write the following:

``from openTEPES.openTEPES import openTEPES_run``

``openTEPES_run(<case>, <dir>, <solver>)``

Tips
####

1. A complete documentation of the openTEPES model can be found at `<https://pascua.iit.comillas.edu/aramos/openTEPES/index.html#>`_, which presents the mathematical formulation, input data and output results.
2. Try modifying the **TimeStep** in **oT_Data_Parameter_<case>.csv** and see their effect on results.
3. Using **0** or **1**, the optimization options can be activated or deactivated in **oT_Data_Option_<case>.csv**.
4. If you need a nice python editor, think about using `PyCharm <https://www.jetbrains.com/pycharm/download>`_. It has many features including project management, etc.

Expected Results
################
.. image:: https://raw.githubusercontent.com/IIT-EnergySystemModels/openTEPES/0a99909cb2001e43627f3df6974f400f3886e899/doc/img/oT_Map_Network_MAF2030.png
:scale: 50 %
:align: center
:alt: Network map with investment decisions

Project details


Release history Release notifications | RSS feed

This version

2.2.3

Download files

Download the file for your platform. If you're not sure which to choose, learn more about installing packages.

Source Distribution

openTEPES-2.2.3.tar.gz (1.8 MB view hashes)

Uploaded Source

Built Distribution

openTEPES-2.2.3-py3-none-any.whl (1.9 MB view hashes)

Uploaded Python 3

Supported by

AWS AWS Cloud computing and Security Sponsor Datadog Datadog Monitoring Fastly Fastly CDN Google Google Download Analytics Microsoft Microsoft PSF Sponsor Pingdom Pingdom Monitoring Sentry Sentry Error logging StatusPage StatusPage Status page