change-orders

Change orders (variation orders) for interior and construction projects, after the client has signed the BOQ.

  • Build a change order from three kinds of change: add an item, remove an item, or change a quantity. It works out the money difference (rates include GST), adds extra days, and records the reason (client request, site condition, design change)
  • Vendor guard: lines already ordered from a vendor can't be removed or reduced. This is checked at draft time and again at approval
  • Apply an approved change order to the BOQ. New lines are tagged CO-01, removed lines are marked, and quantities are updated
  • Shift the plan by the client-approved days (open stages only)
  • Payment milestone for extra cost, or a credit when the change saves money

Works with plain dicts and pairs well with interior-boq. Built from the change-order flow Hexaspace runs on real projects.

Example

from change_orders import build_change_order, apply_change_order, co_number, milestone_for

co = build_change_order(boq, [
        {"action": "add", "name": "Study table", "room": "Bedroom", "category": "carpentry", "unit": "nos", "qty": 1, "rate": 25000},
        {"action": "qty", "line_id": "wardrobe-1", "qty": 50},
    ], number=co_number(0), title="Bedroom changes", days=5, ordered=ids_already_ordered)

co["delta"]                       # money difference incl. GST
new_boq = apply_change_order(boq, co, ordered=ids_already_ordered)
milestone_for(co)                 # {'label': 'Change order CO-01', 'amount': ..., 'kind': 'extra'}

Licence

MIT. Maintained by Hexaspace.

Metadata

Release files for change-orders 0.1.0

For a detailed explanation of source distributions (sdists) and built distributions (wheels), please see the package formats documentation.

Source distribution (sdist)

Source distribution for change-orders 0.1.0
File Size Uploaded Provenance Actions
change_orders-0.1.0.tar.gz 5.8 kB With provenance Details for change_orders-0.1.0.tar.gz

Built distribution (wheel)

Table of built distributions (wheels) for change-orders 0.1.0
File Interpreter ABI Platform Actions
change_orders-0.1.0-py3-none-any.whl Python 3 none any Details for change_orders-0.1.0-py3-none-any.whl

Total release size: 11.4 kB

Release files / change_orders-0.1.0.tar.gz

Download URL change_orders-0.1.0.tar.gz
Size 5.8 kB
Tags Source
SHA-256 checksum
How to use checksums
e422555136e4871760bbc79b2f015eac5eef2202441f1c0fc1983efeb9042e60
BLAKE2b-256 checksum
How to use checksums
169eaef259be9ad6cebae2a5c3df8edcdb9d3eaaab10b2f19ed38b480b1ca3fc
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
Yes
Uploaded via twine/7.0.0 CPython/3.13.16

Provenance

Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.

PyPI Publish Attestation

PyPI verified that this artifact, at this checksum, originated from the publisher listed below.

Signed by GitHub Actions, verified by PyPI on Nov 27, 2026.

Transparency log

Release files / change_orders-0.1.0-py3-none-any.whl

Download URL change_orders-0.1.0-py3-none-any.whl
Size 5.6 kB
Tags Python 3
SHA-256 checksum
How to use checksums
a12643c308410609f704c237589df792ec01998d123314f9cc6adcaaf85b42fc
BLAKE2b-256 checksum
How to use checksums
db8f4fc1c8725469d1aecd429c4f6c379ff3a0fba4a64570b54d58fd416a1e09
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
Yes
Uploaded via twine/7.0.0 CPython/3.13.16

Provenance

Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.

PyPI Publish Attestation

PyPI verified that this artifact, at this checksum, originated from the publisher listed below.

Signed by GitHub Actions, verified by PyPI on Nov 27, 2026.

Transparency log

Security for change-orders 0.1.0

Provenance

Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.

Full provenance

Both files in this release have been uploaded with provenance metadata.

Select from 2 files

Attestation for change_orders-0.1.0.tar.gz

PyPI Publish Attestation

PyPI verified that this artifact, at this checksum, originated from the publisher listed below.

Signed by GitHub Actions, verified by PyPI on Nov 27, 2026.

Transparency log

A note on package security

PyPI is a repository for distributing packages, not a service for auditing them. While third-party security researchers and our staff do their best to detect and remove malicious packages, PyPI cannot guarantee the quality, security or suitability of any given package.

To learn more about protecting yourself from malicious actors, visit our package security documentation.

Release history Release notifications | RSS feed

This release

0.1.0 This release

2 release files Full provenance

Anthropic, PBC Visionary sponsor Bloomberg Visionary sponsor Hudson River Trading Visionary sponsor Meta Visionary sponsor NVIDIA Visionary sponsor Microsoft Sustainability sponsor Depot Continuous Integration AWS Cloud computing and Security Sponsor Datadog Monitoring Fastly CDN Google Download Analytics Sentry Error logging StatusPage Status page