Capacity expansion, multi-duration storage and CO₂ pricing for a 100 % renewable grid, built with PyPSA and HiGHS, with every headline number cross-checked against a solver that shares no code with it.

I built this as the practical half of the Energy Transition microcredential, and I keep the numbers reproducible because a capacity-expansion result is easy to produce and hard to trust. I would read the LCOE as a relative comparison rather than a forecast: the WACC and CapEx surface is probably where most of the uncertainty sits, and the weather year is likely the second. The abatement curve looks roughly steadier, though I would not quote it without the cross-check beside it.

285 tests · Python 3.11–3.13 · MIT · no data download, no API key, no network at run time.

▸ Open the workbench, the whole model solved and in one self-contained HTML file. Offline · Quickstart · Validation

I would rather ship a narrower model I can verify than a broader one I cannot. If a figure here ever stops matching the code, that is a bug in my README, and I want the issue.

Validation: six independent cross-checks, not claims

Check This model Independent reference Residual Reproduce with
LP strong duality system LCOE = demand-weighted LMP = 28.0555 /MWh KKT dual of the same LP 7.45e-09 /yr test_kkt_strong_duality_and_zero_profit_equilibrium
Nodal LMP hourly λ(t) and capacities from PyPSA/linopy standalone sparse scipy.optimize.linprog (HiGHS) primal + dual rel. objective < 1e-10 test_primal_dual_crosscheck_matches_independent_scipy_linprog
CO₂ cap ↔ tax J*_tax(μ*) = J*_cap(Ē) + μ*Ē Lagrangian saddle point rel. gap < 1e-12 test_tax_to_cap_primal_and_saddle_point_equivalence
Meshed DC-OPF congestion rents from PyPSA PTDF flows cycle-KVL / B-θ OPF on the same network rel. objective < 1e-11 test_scipy_btheta_matches_pypsa_cycle_kvl_to_machine_precision
Mean-CVaR plan risk-averse objective, CVaR, first-stage capacities independent 1,357-variable matrix LP rel. CVaR < 1e-11 test_scipy_matrix_matches_pypsa_stochastic_cvar_to_machine_precision
Offline workbench workbench/index.html served by Pages committed workbench/data/etm_workbench_data.json byte-identical etm-workbench check, re-run by CI on every push

Every figure further down is asserted against the code that produces it: tests/test_workbench_and_cvar.py fails the build if a README number drifts from the committed dataset.

Quickstart & verification

Four commands. The first one downloads PyPSA, HiGHS, SciPy and Matplotlib and builds the package. After that the full duality report below runs in about 10 s on a laptop. No data download, no API key, nothing to configure:

git clone --depth 1 https://github.com/hariszafar740-lang/energy-transition-model.git
cd energy-transition-model
python3 -m venv .venv && .venv/bin/pip install -e .
.venv/bin/etm-sim --duality-report
System LCOE (currency/MWh): 28.0555
Demand-weighted LMP (currency/MWh): 28.0555
Strong-duality gap (currency/yr): -7.4506e-09
Max built zero-profit residual: 4.6566e-10

That is the solver's price of energy for a representative day, the demand-weighted dual price, and the gap between them, the identity asserted in the first row of the table above. Add --dunkelflaute-report for the 168 h storage study, --macc-report for the CO₂ abatement curve, --cvar-report for the risk-averse plan.

Full suite: .venv/bin/pip install -e ".[dev]" && .venv/bin/pytest -v, 285 tests, usually several minutes on a laptop.

Deep dive

Formulations, assumptions, sensitivities and figures, module by module.

An open-source energy-system model built on PyPSA (Python for Power System Analysis) and the HiGHS linear-programming solver. It covers capacity expansion with chronological multi-duration storage (Li-Ion BESS + Green H2 Power-to-X). Discounted cash-flow (WACC / CRF / LCOE), KKT nodal shadow-price (LMP) duality, CO2 cap-and-trade and ramp/reserve adequacy. On top of that sits meshed DC-OPF/AC-TEP transmission with mean-CVaR stochastic planning. It also ships a single-file, offline, zero-dependency interactive workbench that renders every solved module in the browser.

Representative-Day Dispatch, KKT Nodal LMP Duality & WACC Sensitivity

Academic Credential & Course Context

This repository serves as the practical engineering implementation for the official microcredential:

  • Course & Badge Title: Modelling the Energy Transition, the revolution of open-source software.
  • Issuing Institution: Politecnico di Milano.
  • Qualification Level: EQF Level 7.

Architecture and modules

  • Single-bus LP baseline (energy_model/model.py): Representative-day capacity expansion (Regional_Grid, System_Demand, Solar_PV, Wind_Turbine, Gas_Peaker) with strict hourly time-series validation (energy_model/profiles.py).
  • Discounted cash-flow & KKT nodal price duality (energy_model/economics.py).
  • Exact Capital Recovery Factor CRF(r, N) annualisation across real discount rates (WACC, r from 0 to 1).
  • Extraction of hourly KKT power-balance dual multipliers λ(t) (LMP), verification of LP Strong Duality (system LCOE = load-weighted λ = 28.0555 /MWh).
  • Boiteux-Turvey-Stoft Zero-Profit Equilibrium, and Brown-Hirth Market-Value Parity (LCOE_g = MV_g).
  • Multi-duration storage & Dunkelflaute chronological adequacy (energy_model/storage.py).
  • Short-duration power-coupled battery (Li_Ion_BESS via PyPSA StorageUnit): 4 h duration, η(ch) = η(dis) = 95 % (η(RTE) = 90.25 %).
  • Cyclic State-of-Charge (SoC), optimal for daily midday-solar-to-evening shifting (278.7 eq. cycles/yr).
  • Long-duration decoupled Power-to-X hydrogen (Green_H2 via PyPSA Bus + Store + Links).
  • The three components are sized independently: H2_Electrolyzer (η(el) = 68 %), H2_Cavern (350 currency/MWh_H2/yr, cyclic SoC), H2_Turbine (η(fc) = 50 %, η(RTE) = 34.0 %).
  • Together they bridge multi-day Dunkelflaute wind/solar lulls (52.1 eq. cycles/yr).
  • Independent matrix LP cross-checks: Both economics.py and storage.py construct standalone scipy.optimize.linprog(..., method="highs") primal + dual matrices confirming < 1e-11 agreement with PyPSA/linopy across capacities.
  • Objective values, and nodal shadow prices.
  • CO2 cap–tax Lagrangian duality & MACC (energy_model/emissions.py): Partial-equilibrium multi-fuel emissions accounting, annual CO2 caps.
  • Pigouvian taxes, and the saddle-point identity J(tax)(μ) = J(cap)(Ē) + μ·Ē to 2.2e-08 currency/yr.
  • Operational flexibility (energy_model/flexibility.py): Intertemporal ramp envelopes, must-run floors, co-optimised upward spinning reserves.
  • And a proof that binding ramps can produce strictly negative nodal prices with non-negative fuel costs (-138.00 currency/MWh).
  • Meshed transmission (energy_model/transmission.py): 4-zone / 5-corridor DC-OPF with PTDF/KVL equivalence.
  • ISO merchandising surplus, AC-TEP co-optimisation, and a Wheatstone-bridge Braess paradox (+62.5% dispatch cost for a zero-cost passive line).
  • Risk-aware planning (energy_model/workbench.py): An explicit 1,357-variable mean-CVaR linear program over 8 weather-and-demand regimes with a Rockafellar–Uryasev epigraph.
  • Dual risk kernel q, and Birge–Louveaux bounds (WS ≤ RP ≤ EEV).
  • Offline workbench (workbench/): etm-workbench build re-solves every module.
  • It writes workbench/data/etm_workbench_data.json, and renders a single self-contained workbench/index.html (no CDN, no fonts, no network requests) that CI re-verifies byte-for-byte on every push.

Multi-duration storage and Dunkelflaute adequacy

Multi-Duration Storage Across a 168 h Chronological Dunkelflaute

Coupled AC + Hydrogen Intertemporal Formulation

Over a chronological horizon t = 0 … T−1 (T = 168 h, annual weight w = 8760 / T):

Σ_g p[g,t] + p[bess,dis,t] − p[bess,ch,t] + p[H2,dis,t] − p[H2,ch,t] = d[t] dual: w · λ[elec,t]
e[bess,t] = (1 − σ[bess]) e[bess,(t−1) mod T] + η[ch] p[bess,ch,t] Δt − (1/η[dis]) p[bess,dis,t] Δt
 0 ≤ e[bess,t] ≤ τ[bess] P[bess]
e[H2,t] = (1 − σ[H2]) e[H2,(t−1) mod T] + η[el] p[H2,ch,t] Δt − (1/η[fc]) p[H2,dis,t] Δt
 0 ≤ e[H2,t] ≤ E[H2] dual: w · λ[H2,t]

168-hour Dunkelflaute adequacy regimes (48 h cold wind and solar lull)

Adequacy Regime Solar_PV Wind_Turbine Li_Ion_BESS (4 h) H2 Electrolyzer / Turbine H2_Cavern Store System LCOE
1. VRE Only (0% Gas) 0.0 MW 5,657.3 MW n/a n/a n/a 294.70 / MWh
2. VRE + 4 h BESS (0% Gas) 0.0 MW 599.5 MW 1,570.0 MW (6,280 MWh) n/a n/a 66.28 / MWh
3. VRE + Green H2 (0% Gas) 148.1 MW 707.9 MW n/a 176.3 / 173.2 MW_e 10,745 MWh_H2 51.92 / MWh
4. Hybrid BESS + H2 (0% Gas) 180.2 MW 679.6 MW 51.8 MW (207 MWh) 153.3 / 132.8 MW_e 10,466 MWh_H2 51.25 / MWh
5. Hybrid + Uncapped Gas Ref. 72.2 MW 375.8 MW 58.5 MW (234 MWh) 5.1 / 1.5 MW_e 215 MWh_H2 43.49 / MWh
  • Efficiency vs.
  • Energy-CapEx Crossover (~6.9 h): For short lulls (0–6 h), Li-Ion BESS (90.25% RTE) achieves lower zero-fossil LCOE than Green H2 (24.01 vs.
  • 26.53 / MWh at 0 h).
  • Beyond ~6.9 h (12–72 h Dunkelflaute), decoupled H2 cavern storage (350 / MWh_H2 / yr) decisively beats 4 h battery packs (66.76 vs.
  • 85.31 / MWh at 72 h), while the Hybrid BESS + H2 portfolio forms the Pareto-optimal lower envelope across every duration.

CO2 cap-tax duality and the abatement curve

Module 3 (energy_model/emissions.py) extends the single-bus capacity-expansion engine with primary-to-electric multi-fuel emissions accounting (e(g) = EF_th,c(g) / η(g)) and PyPSA GlobalConstraint annual CO₂ caps (Ē_CO2). Pigouvian carbon taxes (τ) come with an independent sparse scipy.optimize.linprog (HiGHS) primal/dual cross-check:

  1. Lagrangian cap-tax saddle-point equivalence. Relaxing Σ w(t) e(g) p(g),t Δt ≤ Ē with KKT shadow carbon price μ(CO2) = −dJ_cap(Ē)/dĒ ≥ 0 yields an exact Pigouvian carbon-tax objective. It holds at every point on the convex Pareto frontier: J(tax)(μ(CO2)) = J(cap)(Ē) + μ(CO2) · Ē verified numerically to relative saddle-point residual ≤ 1.6e-15.
  2. Net-Zero Boundary Subdifferential Regularisation (Ē = 0): Because the dual objective max bᵀy − Ēμ assigns zero weight to μ at Ē = 0, the subdifferential −dJ_cap(0) is the half-ray [τ(min)_net-zero, +∞). Evaluating the right-hand limit lim ε↓0⁺ μ(ε) uniquely extracts the minimum Net-Zero carbon price (418.25 currency / tCO₂).

CO2 Pareto Frontier, MACC & Fuel Switching

Multi-fuel decarbonization milestones (168 h representative week, annualised)

Abatement Target Realised CO₂ (tCO2/yr) Shadow Price μ(CO2) (/tCO2) Average Cost (/tCO2) Resource LCOE (/MWh) Dominant Portfolio Regime
0% (BAU) 1,206,958 0.00 0.00 24.34 Coal_Steam (181.8 MW) + CCGT_Gas (7.5 MW)
45% Cap 663,827 6.99 6.15 26.69 Stage I: Wind_Turbine (220.0 MW) + OCGT
75% Cap 301,740 18.61 8.30 29.61 Stage II: Coal -> CCGT (36.2 MW) + Solar_PV (61.6 MW)
96% Cap 48,278 52.77 12.84 34.79 Stage III: 90% Gas_CCS (14.5 MW) + LiIon_BESS (40.5 MWh)
100% Net-Zero 0 418.25 15.89 37.81 Stage IV: Solar + Wind + Green H2 (3,851.9 MWh_H2)
# Run multi-fuel CO2 Pareto frontier & MACC report + 4-panel figure
.venv/bin/python main.py --macc-report --save-macc-plot results/co2_pareto_frontier_and_macc.png

# Apply an explicit Pigouvian carbon tax or annual CO2 cap on the baseline 24 h scenario
.venv/bin/python main.py --co2-price 50 --co2-cap 20000

Ramp-rate envelopes, must-run floors and spinning reserves

Module 4 (energy_model/flexibility.py) introduces intertemporal thermal ramp-rate envelopes (−r(dn),g K(g) ≤ p(g),t − p(g),t−1 ≤ r(up),g K(g)) and minimum stable must-run loading (p(g),t ≥ p(min),pu,g K(g)). It also adds co-optimized upward spinning operating reserves (R(req),t = α_load L(t) + α_vre P(VRE),t) coupled to battery state-of-charge (SoC) sustainment. And a direct sparse scipy.optimize.linprog (HiGHS) primal/dual cross-check:

  1. Co-optimized energy and ancillary-services revenue adequacy (strong LP duality). Across all greenfield regimes with homogeneous operational, ramping, must-run and cyclic SoC constraints, total annualised capital + fuel cost equals nodal energy market revenue plus exogenous load-reserve market revenue to machine precision (≤ 7.5e-09): LCOE_sys = λ̄[load-wtd] + α[load] · μ̄[res, load-wtd]
  2. Intertemporal ramp-induced negative nodal LMP theorem (zero subsidies). Even when every generator has strictly non-negative fuel cost (c(g) ≥ 0), binding downward and upward ramp limits across a deep midday net-load trough telescope multi-period fuel substitutions into an exact negative nodal shadow price. At min c(g) = 0 that price is λ(t0) = −138.00 currency/MWh.

Duck-Curve Ramping, Must-Run Floors & Spinning Reserves

Duck-curve flexibility regimes over 48 h (annualised)

Regime System LCOE (/MWh) Peak LMP (/MWh) Peak Reserve Price (/MW-h) VRE Capacity (MW) OCGT Peaker (MW) LiIon_BESS (MWh) Strong Duality Gap
1_Relaxed_NoReserves 31.56 187.59 0.00 298.58 17.05 0.0 0.00e+00
2_MustRun_And_Ramping 33.61 187.59 0.00 67.32 24.96 0.0 0.00e+00
3_Inflexible_With_Reserves 33.80 187.59 109.59 59.70 36.46 0.0 7.45e-09
4_Flexible_BESS_CoOptimized 32.96 122.87 46.52 188.92 5.87 254.3 7.45e-09
# Run 48 h Duck-Curve flexibility & spinning-reserve comparison + 4-panel figure
.venv/bin/python main.py --flexibility-report --save-flexibility-plot results/duck_curve_ramping_and_reserves.png

# Evaluate explicit thermal ramp, must-run & spinning-reserve constraints on baseline 24 h profiles
.venv/bin/python main.py --ramp-limit 0.35 --must-run 0.25 --reserve-margin 0.08

4-zone DC-OPF, loop flows and transmission expansion

Module 5 (energy_model/transmission.py) models a 4-zone. 5-corridor 380 kV meshed AC transmission grid (North_Wind, West_Solar, South_Hub, East_Metro) with two fundamental Kirchhoff Voltage Law cycles and analytical PTDF matrices. It reports ISO Merchandising Surplus (congestion rent) and co-optimized Transmission Expansion Planning (AC-TEP), and carries an independent sparse scipy.optimize.linprog (HiGHS) nodal phase-angle Bθ cross-check:

  1. Cycle-basis KVL vs. nodal voltage-angle Bθ / PTDF duality. Passive AC flows satisfy f_ℓ,t = b_ℓ(θ_i,t − θ_j,t) = [Φ(g(t) − d(t))]_ℓ, and nodal LMP decomposition λ(t) = λ(ref),t·1 − Φᵀ(μ⁺_t − μ⁻_t) holds to ≤ 1.5e-13.
  2. Triple merchandising surplus and Joskow–Tirole cost recovery. ISO congestion rent satisfies Σ λ(z),t(d(z),t − g(z),t) = Σ over each corridor of (λ(j),t − λ(i),t)·f_ℓ,t = Σ F_ℓ(μ⁺_ℓ,t + μ⁻_ℓ,t) ≥ 0 at every hour. It recovers 100.00% of optimal AC-TEP annualised line CapEx (7,088,134 currency/yr, gap 0.00e+00).
  3. Wheatstone-bridge Braess's paradox in passive AC DC-OPF. Adding a zero-cost 500 MW passive AC bridge across a symmetric congested network reduces cheap power transfer (120.0 -> 82.5 MW) and raises dispatch cost by +62.50% (4,800 -> 7,800 currency/h) via KVL loop binding. A controllable HVDC link, by contrast, unlocks 160.0 MW and cuts cost by -66.67% (1,600 currency/h).

4-Zone Meshed DC-OPF, Congestion Rent & Co-Optimized TEP

4-zone 380 kV transmission and AC-TEP regimes (48 h, annualised)

Regime System LCOE (/MWh) Mean LMP Spread (/MWh) North_Wind (MW) East_OCGT (MW) Total Grid (MW) Congestion Rent (/yr)
1_CopperPlate_SingleBus 19.88 0.00 836.91 0.00 0.0 0
2_Congested_AC_KVL_FixedGrid 30.74 52.90 385.51 154.47 400.0 67,585,265
3_Controllable_HVDC_Transport 28.44 50.90 489.75 131.40 400.0 81,148,386
4_CoOptimized_AC_TEP 21.59 2.70 835.53 7.98 737.1 7,088,134
# Run 4-zone DC-OPF, HVDC & co-optimized AC-TEP comparison + 4-panel figure
.venv/bin/python main.py --transmission-report --save-transmission-plot results/zonal_dcopf_congestion_and_tep.png

# Evaluate co-optimized 4-zone AC transmission expansion or corridor scaling
.venv/bin/python main.py --cooptimize-tep
.venv/bin/python main.py --grid-scale 1.5

WACC and CapEx sensitivity surface, and weather CVaR_95 adequacy

Module 6 (energy_model/risk_sensitivity.py + energy_model/cli.py) unifies parametric 2D financing/learning-curve sensitivity analysis with two-stage multi-weather-year Rockafellar-Uryasev CVaR_95 stochastic resource adequacy and ships the packaged etm-sim console entry point:

  1. Hotelling-Shephard envelope theorem and global cost concavity. Across real discount rates r from 1 % to 15 % and VRE overnight CapEx multipliers κ from 0.55× to 1.75×, optimal greenfield cost J(r, κ) is globally concave in annualised capital costs. Midpoint concavity surplus is +5.82M currency/yr and the portfolio substitution dividend reaches +22.02% against a frozen reference mix. The cost also satisfies exact analytical partial derivatives dJ/dr = Σ K(g) κ_g I(0),g CRF′(r, N(g)) to ≤ 5.4e-10.
  2. Rockafellar-Uryasev two-stage stochastic Mean-CVaR_95 and risk-adjusted complete-market duality. Across an 8-regime meteorological ensemble (WY1_Windy_Equinox → WY8_Severe_Dunkelflaute, V(VoLL) = 1,800 /MWh), KKT epigraph multipliers ρ_ω induce an exact risk-adjusted probability measure q_ω = (1 − β)π_ω + ρ_ω. That measure sums to Σ q_ω = 1 and amplifies tail Dunkelflaute weights by 7.65x at β = 0.35. Under it, strong LP duality and 4-technology zero-profit revenue adequacy hold to ≤ 1.5e-8, cross-checked against an independent sparse scipy.optimize.linprog (HiGHS) matrix to ≤ 1.5e-15.
  3. Birge-Louveaux Stochastic Value Sandwich & Tail Blackout Elimination: Deterministic mean-weather planning suffers 194,479.6 MWh/yr out-of-sample EENS (EEV = 385.13M /yr vs. RP = 49.37M /yr, VSS = 335.76M /yr; WS = 39.21M /yr, EVPI = 10.16M /yr). Risk-neutral RP (β = 0) leaves 29.3 MWh/yr residual Stoft scarcity shedding in WY8, whereas modest CVaR_95 hedging (β = 0.15) eliminates 100% of load shedding (0.0 MWh/yr) for +0.09% expected LCOE (36.39 -> 36.42 /MWh).

2D WACC x CapEx Sensitivity Surface & Weather CVaR_95 Adequacy

Multi-year weather Mean-CVaR_95 risk frontier (VoLL = 1,800 /MWh)

Risk Weight β Expected Cost E[Z] (/yr) Tail CVaR_95 (/yr) E[LCOE] (/MWh) EENS (MWh/yr) Solar_PV (MW) Wind (MW) Li_Ion_BESS (MW) Gas_Peaker (MW)
0.00 (RP) 49,367,339 123,698,409 36.39 29.3 144.9 320.9 75.8 184.4
0.15 49,409,902 122,790,530 36.42 0.0 149.4 318.9 81.1 184.5
0.35 (Hedged) 49,452,092 122,643,766 36.45 0.0 159.5 313.1 81.6 184.1
0.60 49,925,568 122,289,968 36.80 0.0 192.5 299.8 81.9 184.1
1.00 (CVaR) 83,937,794 113,396,667 61.87 0.0 491.7 0.0 0.0 273.0
# Run packaged etm-sim CLI: 2D WACC x CapEx surface + CVaR_95 frontier + 4-panel figure
.venv/bin/etm-sim --sensitivity-report --cvar-report \
--save-risk-plot results/wacc_capex_surface_and_cvar_adequacy.png

# Evaluate custom financing/CapEx scenario + stochastic CVaR run + JSON telemetry export
.venv/bin/etm-sim --wacc 0.04 --vre-capex-scale 0.75 --cvar-beta 0.35 --json-summary /tmp/etm_summary.json

Interactive Energy-Transition Workbench

Module 7 turns the model family into an artifact you can open: a single ~170 kB HTML file with no CDN. No web fonts, no <script src>, no fetch(), and no build step required to read it. Open workbench/index.html from a local clone (or the live Pages deployment) and every panel (dispatch, storage, carbon. Reserves, meshed grid and risk) is driven by numbers that were produced by solving the linear programs in this repository.

▶ Open the live workbench · workbench/index.html · workbench/data/etm_workbench_data.json

Build → render → verify contract

solved models ──► workbench/data/etm_workbench_data.json ──► workbench/index.html
 (PyPSA/HiGHS) (single source of truth) (single-file UI)
  • etm-workbench build re-solves all six model families (149 optimisations, 118 PyPSA/linopy solves + 31 explicit mean-CVaR LPs.
  • ≈120 s), embeds the results as a JSON dataset with an etm-workbench/1 schema, and renders the page.
  • etm-workbench render re-renders the page from the committed dataset only (≈2 s, no solver).
  • etm-workbench check re-renders in memory and compares byte-for-byte with the committed file.
  • CI fails on any drift, so a hand-edited figure cannot survive a push.
  • Every page embeds sha256 of its dataset in <meta name="etm-data-digest">.
  • The footer prints the same digest, so a downloaded page can be traced back to the exact dataset that produced it.

The page itself

View What it shows Interaction
00 Overview 5×5 exact LCOE surface, module map, cross-module invariant table click any cell → loads that case
01 Dispatch & LCOE stacked hourly dispatch, annual cost stack, nodal price WACC and VRE-CapEx sliders (bilinear interpolation between 25 solved nodes)
02 Storage & lulls BESS-only / H₂-only / hybrid LCOE vs. lull length, 168 h SoC and dispatch lull-duration scrubber
03 Carbon & MACC Pareto frontier, dual carbon price, step MACC, fuel-switching mix abatement-target scrubber
04 Flexibility net load vs. nodal price, reserve requirement vs. reserve price 4-regime switch
05 Meshed grid live 4-zone network diagram, corridor flows, zonal LMP, PTDF matrix 4-regime switch + hour slider
07 Risk & CVaR mean–CVaR frontier, dual risk kernel q, Birge–Louveaux bounds β scrubber
99 Method & checks surrogate holdout parity, build provenance, test inventory, explicit limits n/a

Keyboard: 1…8 switch views, [ / ] step through them. Each view has a deep-link hash (#/risk?beta=5), CSV export of its table, SVG export of its active chart, and a light/dark theme toggle. The page works offline, from file://, in print, and under prefers-reduced-motion. The workbench is mostly a renderer: it solves nothing when you open it.

The explicit mean-CVaR program

Eight weather-and-demand regimes ω (windy equinox → severe Dunkelflaute, π_ω summing to 1.000) are solved jointly as one linear program in 1,357 variables and 1,352 constraints. The constraint matrices are explicit and sparse:

min over K, p, η, z: (1 − β) Σ_ω π_ω Z_ω + β [ η + (1/(1 − α)) Σ_ω π_ω z_ω ]
subject to: Z_ω ≤ η + z_ω, z_ω ≥ 0

where Z_ω is the annual cost of future ω (annualised CapEx + gas fuel + VoLL × unserved energy, 1,800 currency/MWh) and K is the shared first-stage capacity vector. The hourly recourse dispatch p_ω carries the cyclic battery state of charge. The epigraph is the Rockafellar–Uryasev representation of CVaR_α, so η = VaR_α, and the duals of the epigraph rows are the risk kernel q.

Mean-CVaR Frontier, Dual Risk Kernel, Birge–Louveaux Bounds & Hedge Composition

Verified risk/return frontier (α = 95 %, annualised, cost in currency/yr)

β E[Z] (M) CVaR_95 (M) System LCOE Risk premium Tail reduction EENS (MWh/yr) Solar Wind Gas BESS
0.00 40.14 105.24 28.79 / MWh +0.00 0.0% 167.5 79 MW 309 MW 192 MW 69 MW
0.10 40.41 99.67 28.98 / MWh +0.19 5.3% 0.0 91 MW 315 MW 192 MW 99 MW
0.20 40.78 97.57 29.25 / MWh +0.46 7.3% 0.0 51 MW 374 MW 189 MW 97 MW
0.35 42.08 94.86 30.18 / MWh +1.39 9.9% 0.0 61 MW 413 MW 215 MW 67 MW
0.50 42.41 94.38 30.42 / MWh +1.63 10.3% 0.0 30 MW 437 MW 215 MW 65 MW
0.65 48.55 90.31 34.82 / MWh +6.03 14.2% 0.0 0 MW 571 MW 172 MW 94 MW
0.80 59.41 86.40 42.61 / MWh +13.82 17.9% 0.0 0 MW 752 MW 216 MW 32 MW
0.90 60.75 86.17 43.57 / MWh +14.78 18.1% 0.0 0 MW 772 MW 203 MW 43 MW
1.00 61.23 86.12 43.92 / MWh +15.13 18.2% 0.0 0 MW 779 MW 198 MW 47 MW

Reading the frontier: 1.39 currency/MWh of insurance buys 9.9% off the worst-5% tail and eliminates every expected blackout hour (β = 0.35). Beyond β ≈ 0.65 the hedge rotates out of solar entirely into wind plus storage, and the marginal price of tail reduction rises steeply. The classic convexity of the mean–CVaR frontier. Objective-to-primal duality gap ≤ 7.4e-08 currency/yr against qᵀZ at every β.

Dual risk kernel q (Rockafellar–Uryasev)

At β = 0.5 the epigraph duals concentrate probability exactly where the tail lives:

Regime π_ω q_ω (β=0.5) Ceiling π_ω/(1 − α)
WY1_Windy_Equinox 0.180 0.090 3.60
WY2_Sunny_Anticyclone 0.170 0.085 3.40
WY3_Temperate_Normal 0.250 0.125 5.00
WY4_Cloudy_Maritime 0.160 0.080 3.20
WY5_Summer_Heat_Wave 0.140 0.170 2.80
WY6_Winter_Cloud_Trough 0.060 0.030 1.20
WY7_Polar_Vortex_Freeze 0.025 0.2625 0.50
WY8_Severe_Dunkelflaute 0.015 0.1575 0.30

The kernel satisfies Σ q_ω = 1 and 0 ≤ q_ω ≤ π_ω/(1 − α) to 1e-9. At β = 1 it degenerates onto the three worst futures only (WY8 0.30, WY7 0.50, WY2 0.20) each sitting exactly on its ceiling. This is what "pure worst-tail optimisation with £-per-tail-mass pricing" means numerically.

Birge–Louveaux stochastic bounds (risk-neutral, β = 0)

Bound Annual cost Construction
Wait-and-see WS 28.62 M bespoke capacity plan per future (8 separate LPs)
Recourse RP 40.14 M one hedged plan across all 8 futures
Expected-value plan EEV 345.08 M plan built for the mean future, then evaluated on all 8

EVPI = 11.52 M/yr, VSS = 304.94 M/yr, ordering WS ≤ RP ≤ EEV holds with slack. The expected-value plan builds 24 MW solar, 320 MW wind, 93 MW battery and 0 MW gas. Averaged over the eight futures it costs 8.6× the hedged plan, because a single mean future never contains the +78 MW Dunkelflaute night that dominates the tail.

The reduced-order surrogate, and its measured error

The overview and dispatch views let the reader sweep WACC in [1%, 15%] and VRE CapEx in [0.55, 1.75]× continuously. A continuous sweep is not free: every grid node is one LP. The workbench therefore ships the exact 5×5 solved surface and bilinearly interpolates between nodes. It then measures the interpolation error on 16 node positions that were never used to build it.

Metric Value
Holdout solves 16 (4 × 4 mid-quadrant nodes)
R² (surrogate vs. exact) 0.999705
RMSE 0.206 currency/MWh
Max absolute error 0.80 currency/MWh
Max relative error 1.37%

Where a slider sits between solved nodes, the page labels every KPI as interpolated and draws the hourly chart from the nearest exactly-solved node. Interpolation never masquerades as a solve.

Reproduce the workbench

python -m venv .venv
.venv/bin/python -m pip install --upgrade pip "setuptools>=77.0" wheel build
.venv/bin/python -m pip install --no-build-isolation -e ".[dev]"

# Re-solve every module (149 optimisations) and re-render the single-file page
.venv/bin/etm-workbench build

# Cheap re-render from the committed dataset, and the drift gate used by CI
.venv/bin/etm-workbench render
.venv/bin/etm-workbench check

# Static 4-panel figure for this section
.venv/bin/python -c "from energy_model.workbench import plot_risk_frontier_and_kernel; \
plot_risk_frontier_and_kernel('results/risk_frontier_and_cvar_kernel.png')"

Limits of the workbench (read before citing)

  • The CVaR panel is an independent explicit-LP re-derivation on its own declared 8-regime scenario set (own demand shape, own VRE availability, own VoLL).
  • It is not a numerical replica of the Module 6 risk model, and it deliberately does not call it.
  • Agreement between two independent formulations would be meaningless if one called the other.
  • The 8 regimes are synthetic stress shapes, not reanalysis weather years; π_ω is a declared prior, not an estimated frequency.
  • All costs are illustrative and currency-agnostic.
  • The surrogate is an interpolation of solved LPs, bounded by the holdout error above.
  • It is not a fitted model and carries no extrapolation guarantee outside the plotted grid (sliders clamp at the edges).
  • In practice the binding limit is the input data, not the solver: synthetic profiles and illustrative costs set the ceiling on what any number here can mean.
  • DC power flow, lossless corridors, continuous investment, no unit commitment; see the shared boundaries in Inputs, Assumptions & Provenance.

Inputs, Assumptions & Provenance

  • Shipped 24 h baseline (energy_model/data/profiles_synthetic_24h.csv) and 168 h Dunkelflaute sequence (generate_dunkelflaute_profiles) are deterministic synthetic benchmarks designed to verify time-series constraints.
  • KKT shadow-price duality, and chronological storage arbitrage.
  • They are not metered SCADA or meteorological reanalysis records.
  • Cost inputs (DEFAULT_TECHNOLOGIES, BatteryStorageSpec, HydrogenP2XSpec) are illustrative annualised parameters without a specified currency.
  • Outputs represent exact mathematical consequences of the stated linear programs and are not real-world investment quotes or engineering certification.
  • I chose synthetic profiles over a data download, so the whole repository runs offline in one command.
  • Workbench dataset (workbench/data/etm_workbench_data.json) is generated, never hand-edited: it is the serialised output of etm-workbench build.
  • Its sha256 is embedded in workbench/index.html, and CI fails if the two ever disagree.
  • The 8 Module-7 regimes are declared synthetic stress cases with an assumed prior, not estimated weather frequencies.

Quickstart & Verification

python -m venv .venv
.venv/bin/python -m pip install --upgrade pip "setuptools>=77.0" wheel build
.venv/bin/python -m pip install --no-build-isolation -e ".[dev]"

# Representative-day baseline + KKT LMP duality + 168 h Dunkelflaute multi-duration storage
.venv/bin/python main.py --duality-report --dunkelflaute-report --save-plot results/baseline_dispatch_and_lmp_duality.png --save-storage-plot results/multiduration_storage_dunkelflaute_dispatch.png

# Lint, formatting check, artifact freshness gate, and full pytest suite
.venv/bin/ruff check .
.venv/bin/ruff format --check .
.venv/bin/etm-workbench check
.venv/bin/pytest -v

Workbench in one line: etm-workbench build re-solves all six model families and rewrites workbench/index.html; etm-workbench check proves the committed page still matches the committed dataset. The published copy lives at https://hariszafar740-lang.github.io/energy-transition-model/workbench/.

License

Released under the MIT License. Copyright (c) 2026 Haris Zafar.

Metadata

Release files for energy-transition-model 1.0.0

For a detailed explanation of source distributions (sdists) and built distributions (wheels), please see the package formats documentation.

Source distribution (sdist)

Source distribution for energy-transition-model 1.0.0
File Size Uploaded Provenance Actions
energy_transition_model-1.0.0.tar.gz 178.7 kB Without provenance Details for energy_transition_model-1.0.0.tar.gz

Built distribution (wheel)

Table of built distributions (wheels) for energy-transition-model 1.0.0
File Interpreter ABI Platform Actions
energy_transition_model-1.0.0-py3-none-any.whl Python 3 none any Details for energy_transition_model-1.0.0-py3-none-any.whl

Total release size: 309.0 kB

Release files / energy_transition_model-1.0.0.tar.gz

Download URL energy_transition_model-1.0.0.tar.gz
Size 178.7 kB
Tags Source
SHA-256 checksum
How to use checksums
1a2c6003f50a357bfeab7de9102c22985f4f91d8092dc36bf5eef36af80be4f3
BLAKE2b-256 checksum
How to use checksums
d64175d8bd1c0f03bf76afbab4524760c7e6678ecee68f6ace6438440d71b91d
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
No
Uploaded via twine/7.0.0 CPython/3.13.15

Release files / energy_transition_model-1.0.0-py3-none-any.whl

Download URL energy_transition_model-1.0.0-py3-none-any.whl
Size 130.3 kB
Tags Python 3
SHA-256 checksum
How to use checksums
ff6ccc1091e7b57a8c3791e09b7632127537b1f6dc823da1ccd103052c136417
BLAKE2b-256 checksum
How to use checksums
3f01749eb749b3288c5371aa2b33c5734eb727ca6fbbc07eeb43c30acd1b2d3e
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
No
Uploaded via twine/7.0.0 CPython/3.13.15

Security for energy-transition-model 1.0.0

Provenance

Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.

No provenance found

None of the files in this release were uploaded with provenance metadata.

A note on package security

PyPI is a repository for distributing packages, not a service for auditing them. While third-party security researchers and our staff do their best to detect and remove malicious packages, PyPI cannot guarantee the quality, security or suitability of any given package.

To learn more about protecting yourself from malicious actors, visit our package security documentation.

Release history Release notifications | RSS feed

This release

1.0.0 This release

2 release files No provenance

Anthropic, PBC Visionary sponsor Bloomberg Visionary sponsor Hudson River Trading Visionary sponsor Meta Visionary sponsor NVIDIA Visionary sponsor Microsoft Sustainability sponsor Depot Continuous Integration AWS Cloud computing and Security Sponsor Datadog Monitoring Fastly CDN Google Download Analytics Sentry Error logging StatusPage Status page