gantt2drawio turns a small YAML project definition into an editable draw.io (.drawio) Gantt chart.

The package is intentionally a renderer, not a full project-management system. You provide calendar dates or relative positions such as M0 and M6; the package handles validation, timeline layout, and draw.io XML generation.

See it in action

1. YAML input 2. Terminal preview
YAML configuration for a relative-month Gantt chart Terminal preview produced by gantt2drawio

3. Editable draw.io output

Editable relative-month Gantt chart generated by gantt2drawio

What it supports

  • Calendar tasks using ISO dates and calendar-day (d) or week (w) durations
  • Relative-month tasks using positions such as M0 and durations such as 6M
  • Milestones on calendar dates or within complete relative months
  • Optional inherited starts for relative tasks
  • Weekly, monthly, or automatically selected timelines
  • Optional task and milestone colors
  • Configurable wrapping, clipping, and ellipsis for long item names
  • Strict validation with field-specific errors
  • Editable draw.io shapes with stable IDs
  • A command-line interface and a small Python API
  • Dependency-free Unicode and ASCII terminal previews
  • Deterministic, uncompressed XML suitable for version control

Version 0.6 deliberately does not include dependencies, automatic scheduling, nested groups, progress bars, business-day calendars, or critical-path analysis.

Installation

The package requires Python 3.9 or newer.

Install the project from this directory:

python -m pip install .

For development, install it in editable mode with the test dependency:

python -m pip install -e ".[dev]"

Quick start

Calendar timeline

Create project.yaml:

version: 1

chart:
  title: Research project
  scale: month

items:
  - id: literature-review
    type: task
    name: Literature review
    start: 2026-08-01
    duration: 4w

  - id: experiments
    type: task
    name: Run experiments
    start: 2026-09-01
    end: 2026-11-30
    color: "#59A14F"

  - id: final-report
    type: milestone
    name: Final report submitted
    date: 2026-12-15

Validate it:

gantt2drawio validate project.yaml

Generate the diagram:

gantt2drawio build project.yaml -o project.drawio

If -o is omitted, the output uses the input name with a .drawio suffix:

gantt2drawio build project.yaml
# writes project.drawio

Open the resulting file in the draw.io desktop application or import it into diagrams.net. Task bars, milestone diamonds, labels, and table cells are native editable diagram elements.

Relative timeline

Use relative mode when exact calendar dates are not known:

version: 1

chart:
  title: Relative research programme
  mode: relative
  unit: month
  start: M0
  end: M18

items:
  - id: literature-review
    type: task
    name: Literature review
    duration: 6M

  - id: first-review
    type: milestone
    name: First review
    date: M3

  - id: experiments
    type: task
    name: Run experiments
    start: M4
    end: M12

Because the first task has no start, it inherits chart.start. Its 6M duration covers the six complete months M0 through M5. Save the definition as relative-project.yaml and generate it in exactly the same way:

gantt2drawio build relative-project.yaml

Terminal preview

Preview a chart without creating a draw.io file:

gantt2drawio preview examples/relative.yaml

Example output:

Relative research programme — M0 to M18 (relative-month)

Item                M0   M1   M2   M3   M4   M5
────────────────────────────────────────────────
Literature review  ███████████████████████████
First review                    ◆
Run experiments                      ██████████

█ task  ◆ milestone

The preview uses the same resolved dates, relative positions, and timeline geometry as the draw.io renderer. It scales to the current terminal width and truncates long names when necessary.

Useful preview options:

# Select a width
gantt2drawio preview project.yaml --width 120

# Use portable ASCII characters
gantt2drawio preview project.yaml --ascii

build prints a preview automatically when its output is an interactive terminal. This avoids adding noise when the command is redirected or used in a script. The behavior can be controlled explicitly:

# Force a preview when output is redirected
gantt2drawio build project.yaml --preview

# Suppress an interactive preview
gantt2drawio build project.yaml --no-preview

# Configure the build preview
gantt2drawio build project.yaml --preview-width 120 --ascii-preview

YAML reference

Top level

Field Required Description
version No Schema version. If present, it must be the integer 1.
chart No Chart-wide configuration.
items Yes A non-empty list of tasks and milestones.

Unknown fields are rejected. This helps catch spelling mistakes rather than silently ignoring them.

Chart

Calendar mode is the default:

chart:
  title: Research project
  scale: auto
  start: 2026-01-01
  end: 2026-12-31
Field Default Description
title Gantt chart Title shown above the chart.
mode calendar calendar or relative.
scale auto Calendar mode only: week, month, or auto.
unit month Relative mode only. Version 0.6 supports month.
start Mode-dependent An ISO date or relative position such as M0.
end Latest item An inclusive ISO date or relative month such as M18.
label_width 240 Item-name column width, from 120 to 600.
label_max_lines 2 Maximum displayed lines for ellipsis or clip, from 1 to 10.
label_overflow ellipsis ellipsis, wrap, or clip.

auto selects a weekly timeline for projects up to 120 days and a monthly timeline for longer projects. Explicit chart bounds may extend the item range, but may not exclude an item.

Relative mode uses equal-width abstract month intervals:

chart:
  mode: relative
  unit: month
  start: M0
  end: M18

chart.start defaults to M0 in relative mode. chart.end is optional and is derived from the latest task or milestone. Calendar dates and relative positions cannot be mixed in the same chart. scale is not used in relative mode because unit determines the timeline.

Tasks

Every task requires id, type, and name, plus exactly one of end or duration.

In calendar mode, start is required:

Using an explicit end date:

- id: experiments
  type: task
  name: Run experiments
  start: 2026-09-01
  end: 2026-11-30

Using a duration:

- id: review
  type: task
  name: Literature review
  start: 2026-08-01
  duration: 10d

End dates are inclusive. Therefore, a task starting on 2026-08-01 with duration: 10d ends on 2026-08-10.

Supported duration units are:

Suffix Meaning Example
d Calendar days 10d
w Seven-day weeks 4w

In relative mode, start may be omitted. An omitted start inherits chart.start, which defaults to M0:

- id: work-package
  type: task
  name: Work package
  duration: 6M

This task starts on the first day of M0 and ends on the last day of M5, representing exactly six complete relative months. An explicit range uses inclusive month semantics:

- id: experiments
  type: task
  name: Run experiments
  start: M4
  end: M12

Relative positions must be non-negative integer values such as M0, M3, or M18. Relative durations use an uppercase M, such as 1M or 6M.

Timeline columns represent complete months and are labelled M0, M1, M2, and so on. Both start and end are inclusive: a task with start: M0 and end: M6 spans seven full columns, M0 through M6. A task with start: M0 and duration: 6M spans M0 through M5.

Milestones

A milestone requires id, type, name, and date:

- id: approval
  type: milestone
  name: Protocol approved
  date: 2026-09-18

In relative mode, date identifies a complete relative month:

- id: approval
  type: milestone
  name: Protocol approved
  date: M3

The milestone diamond is placed in the centre of the M3 month cell.

Long item names

Control task and milestone name layout through the chart settings:

chart:
  label_width: 240
  label_max_lines: 2
  label_overflow: ellipsis

The available overflow modes are:

Mode Behavior
ellipsis Show at most label_max_lines and add ... when text is omitted.
wrap Show the complete name and expand the row height as necessary.
clip Show at most label_max_lines without adding ....

Wrapping prefers word boundaries, breaks unusually long words when necessary, and treats Chinese, Japanese, and Korean characters as double-width. Task bars and milestone diamonds remain vertically centered when a row expands.

The complete original name is always retained in the generated XML as fullName and tooltip metadata, even when the visible label is shortened.

IDs and colors

IDs must be unique and may contain letters, numbers, dots, underscores, and hyphens. They are used to create stable draw.io cell IDs.

Colors are optional six-digit hexadecimal values:

color: "#4C78A8"

Tasks default to blue and milestones default to red.

Python API

Generate a file directly:

from gantt2drawio import render_file

render_file("project.yaml", "project.drawio")

Or validate and render in memory:

from gantt2drawio import load_project, render

project = load_project("project.yaml")
xml = render(project)

Terminal previews are also available through the Python API:

from gantt2drawio import load_project, render_preview

project = load_project("project.yaml")
print(render_preview(project, width=100))

Validation failures raise GanttValidationError; file access failures raise GanttInputError. Both inherit from GanttError.

Validation errors

The validator reports the YAML location and all issues it can safely identify:

project.yaml is not a valid Gantt definition:
  - items[0].duration must use a positive 'd' or 'w' duration such as '10d' or '4w'
  - items[1].date must be a valid ISO date in YYYY-MM-DD form

The CLI returns status code 0 on success and 2 for validation or file errors.

Examples

  • examples/basic.yaml demonstrates a monthly research plan.
  • examples/weekly.yaml demonstrates a short weekly plan.
  • examples/relative.yaml demonstrates an 18-month relative plan.
  • examples/long-labels.yaml demonstrates ellipsis with English and Chinese names.

Generate all examples with:

gantt2drawio build examples/basic.yaml
gantt2drawio build examples/weekly.yaml
gantt2drawio build examples/relative.yaml
gantt2drawio build examples/long-labels.yaml

Development

Run the test suite:

python -m pytest

The tests cover calendar and relative durations, strict YAML validation, inclusive calendar dates, inclusive relative-month semantics, timeline geometry, Unicode-aware label formatting, terminal previews, deterministic XML rendering, and all CLI commands.

License

MIT

Metadata

Release files for gantt2drawio 0.6.0

For a detailed explanation of source distributions (sdists) and built distributions (wheels), please see the package formats documentation.

Source distribution (sdist)

Source distribution for gantt2drawio 0.6.0
File Size Uploaded
gantt2drawio-0.6.0.tar.gz 30.3 kB Details

Built distribution (wheel)

Table of built distributions (wheels) for gantt2drawio 0.6.0
File Interpreter ABI Platform
gantt2drawio-0.6.0-py3-none-any.whl Python 3 none any Details

Total release size: 55.7 kB

Release files / gantt2drawio-0.6.0.tar.gz

Download URL gantt2drawio-0.6.0.tar.gz
Size 30.3 kB
Tags Source
SHA-256 checksum
How to use checksums
056b560ef531945e7680d8d4132660a16e403c236e0aeaa5737a5c160c866eef
BLAKE2b-256 checksum
How to use checksums
c3e2e4b7aafd2fbd825bf70b0a157f51cd72f00801233a7a55c8baaff5077375
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
No
Uploaded via twine/6.2.0 CPython/3.9.7

Release files / gantt2drawio-0.6.0-py3-none-any.whl

Download URL gantt2drawio-0.6.0-py3-none-any.whl
Size 25.4 kB
Tags Python 3
SHA-256 checksum
How to use checksums
c3731c0485edda64d02300571b0a9e899876d59db340b74cf8e6a699b961a010
BLAKE2b-256 checksum
How to use checksums
d488b2284df64ade08c9d44650aec540841f810ef92f6b7ccb646abc0c32fab1
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
No
Uploaded via twine/6.2.0 CPython/3.9.7

Release history Release notifications | RSS feed

0.7.0

2 release files

This release

0.6.0 This release

2 release files

Anthropic, PBC Visionary sponsor Bloomberg Visionary sponsor Hudson River Trading Visionary sponsor Meta Visionary sponsor NVIDIA Visionary sponsor Microsoft Sustainability sponsor Depot Continuous Integration AWS Cloud computing and Security Sponsor Datadog Monitoring Fastly CDN Google Download Analytics Sentry Error logging StatusPage Status page