HoldSpeak
One local copilot, two modes: dictation that types anywhere and learns how you work, and meetings that end with decisions, actions, and follow-ups instead of a recording. Nothing leaves your machine.
Hold a key and speak, and your words land in whatever app you are in, optionally rewritten by your own model with your project's context. Record or import a meeting, and it comes back as reviewable decisions, action items, and typed artifacts, with a follow-up panel that shows what is still open. One local runtime on macOS and Linux does both, for the two places a developer's voice does work: the keyboard and the meeting. Whisper runs locally; the LLM is one you run or point at. No cloud, no account, no telemetry.
Status: 0.x, early but real. HoldSpeak is on PyPI (
pip install holdspeak). The features are mature; APIs, config, and defaults can still change while it is pre-1.0. Upgrades are safe by default (your data is backed up first). Feedback and contributions welcome.
The two modes
| Dictate | Meet |
|---|---|
Hold the hotkey, speak, release: the text goes into the active app. Turn on the dictation pipeline and rough speech is routed by intent, enriched with your project's context, and rewritten for its target (Codex, Claude, the terminal, the browser, your editor). Every run lands in the dictation journal; one tap on a wrong result teaches the correction memory. Voice commands map a spoken keyword to a real action (open a URL, launch an app, run a command). Say the wake phrase and it listens hands-free, with the result previewed, never typed, until you confirm; an optional preview mode does the same for every dictation (the card shows the text first, Type it commits, Discard drops it). The spoken language setting pins any of Whisper's 99 languages, and the spoken-symbol dictionary types your own vocabulary ("double colon" becomes ::). Activity pre-briefing offers what you touched recently as dictation context, source-cited. |
Capture mic and system audio live with speaker labels, or import a recording or a transcript file you already have (vtt and srt keep their real timestamps and speaker names). 14 built-in plugins call your LLM to pull typed artifacts out of the transcript: decisions, action items, ADRs, risk registers, incident timelines. Meeting aftercare then shows what is open, decided, and changed since last time; an accepted action can become a filed issue, and the digest or follow-up draft can go to your team through Send to Slack, all on a propose, approve, execute flow that never acts without you. The archive is searchable and filterable by date, speaker, tag, and open actions. |
This is what they look like in the product, not in pixel art. A saved meeting comes back as typed, reviewable artifacts:
A meeting after intelligence ran: a risk register, decisions, and requirements, each extracted by an LLM-backed plugin and rendered read-only at /history.
The Desk
Launch holdspeak and the browser opens on the Desk: everything the two
modes produce, living as objects in one spatial world. Meetings, notes,
knowledge bases, agents, and their artifacts float on the stage; zones are
shelves you drag things onto; tap anything and it opens in place.
The front door: the world your voice work lives in. The orb records, the rail asks, the tray files.
The Desk is where the loops close. Press the orb and the hub records a meeting; when it ends, the meeting lands on the stage as an object. Ask an agent from the rail and its answer persists as an artifact you can open, trace (the lineage chip names the agent that made it), and file into a zone. The egress badge in the corner is the one trust answer: local, or exactly which endpoint. See The Desk.
Why it's different
- Everything is local, including the intelligence. Whisper transcribes on your machine, in any of its 99 languages, and the LLM is yours: GGUF in-process, MLX on Apple Silicon, or any OpenAI-compatible endpoint you choose, including one on your own LAN. Name those as reusable runtime profiles and run a different one per agent; the profile shape syncs across your surfaces while the API key stays on each one, never synced. See Security & privacy and Models.
- It learns how you work, and shows you the receipts. The dictation journal records what you said, what it typed, where it routed, and how long it took. Fix a wrong result in one tap and the correction memory learns; the learning digest reports a real "learned from N similar" count, honest at zero; replay an old utterance through the updated pipeline and watch the routing change. See the learning loop.
- Meetings end with their loops closed. A meeting produces artifacts, an aftercare digest, and approval-gated actions where most tools stop at a transcript. Actuators are off by default, audited, and only ever run exactly what you previewed. See meeting intelligence.
- Honest by construction.
holdspeak doctorreports what is actually broken. The import panel says which timestamps are approximate. The learning digest never inflates a count. Upgrades back your database up before touching it and refuse to open data written by a newer build. The docs hold themselves to the same bar.
See it learn
Because every dictation is recorded, you can look back at what it heard, fix a mistake in one tap (which teaches it), and replay the utterance through the updated pipeline. Instead of trusting that it improved, you watch it happen. See the full walkthrough.
The dictation journal. Every utterance, with what you said, what it typed, where it routed, and how long it took.
The learning digest. Honest, windowed counts from the same matcher that nudges your routing.
Meet Qlippy
Yes, he is a paperclip. The famous one had two problems: he interrupted you, and he could not actually do anything. Qlippy is the apology for both. He lives on the desktop presence surface (opt-in, two switches deep), spends most of his time as a tiny animated dock sprite mirroring what the runtime is doing, and slides out a card only for the few moments that genuinely need you: an action awaiting your approval, a correction that actually reached past dictations, a meeting that ended with open items.
The marquee moment, on a real desktop: a proposed GitHub issue waiting for a decision. The native panel takes pointer clicks only while a card shows and can never steal keyboard focus.
He never acts on his own. Approving on his card sends the identical audited request the dashboard sends. Every card carries the egress badge, one small pill that says at a glance whether its data stays local or goes out, and to where. Dismissing him is always safe, and he is honest to a fault: the "Learned from you" card only ever appears when a correction really reached past dictations, with the real count.
| A decision needs you | Learned from you |
|---|---|
| The exact preview, the destination on the badge, your call. | Only when a correction really reached past dictations, with the honest count. Local only. |
Off by default, like everything ambient here. Turn him on under Settings, Desktop presence, "Qlippy, the mascot".
How it compares (as of mid-2026)
Honest comparisons, architecture-level on purpose: where your audio goes, what the tool spans, and whether it learns. These tools are good at what they do; pick the one that fits.
| Tool | What it does better | What HoldSpeak does better |
|---|---|---|
| OS dictation (Apple Dictation, Windows Voice Typing) | Zero setup, free, always available | Your own models, LLM rewriting with project context, the learning loop, meetings |
| Local Whisper apps (superwhisper, MacWhisper, VoiceInk) | Simpler setup, polished single-purpose UX | The LLM stays local too (their AI modes often call cloud APIs), a visible learning loop, meeting intelligence, Linux support |
| AI dictation services (Wispr Flow, Aqua Voice) | Out-of-box accuracy and editing polish, no model management | Your voice never leaves your machine, open source, no subscription, meetings |
| Talon | The deepest hands-free coding and computer control there is | Prose-first dictation with LLM rewriting, lower learning curve, meeting intelligence |
| Raw Whisper tooling (whisper.cpp scripts) | Total control, minimal surface | A product: typing integration, routing, the journal, meetings, a web UI |
And the trade-offs in the other direction: HoldSpeak is 0.x, the smart parts need a model you provide, setup is heavier than a menu-bar app, there is no Windows build today, and Wayland limits global hotkeys to best effort.
Quickstart
Install from PyPI, check your setup, and launch the web runtime:
pip install holdspeak
holdspeak doctor # check mic permissions and backends
holdspeak # launch the web runtime (the browser opens on the Desk)
Prefer uv? uv pip install holdspeak.
Or use the install script (creates an isolated venv and a holdspeak launcher),
or work from a clone:
# one-line install
curl -fsSL https://raw.githubusercontent.com/karolswdev/HoldSpeak/main/scripts/install.sh | bash
# or from a clone (for development)
git clone https://github.com/karolswdev/HoldSpeak.git && cd HoldSpeak
uv pip install -e .
holdspeak doctor && holdspeak
Install only the extras you need:
pip install 'holdspeak[meeting]' # meeting mode and AI intelligence
pip install 'holdspeak[dictation-mlx]' # the dictation pipeline on Apple Silicon (MLX)
pip install 'holdspeak[dictation-llama]' # the dictation pipeline, cross-platform (GGUF)
pip install 'holdspeak[dictation-openai]' # the dictation pipeline via an OpenAI-compatible endpoint
(From a clone, use the editable form instead, e.g. uv pip install -e '.[meeting]'.)
The dictation and meeting LLM is yours to choose. See
docs/MODELS.md for the contract and current suggestions.
Upgrading and your data
Your whole HoldSpeak database is a single SQLite file. Before a version jump you
can snapshot it with holdspeak backup, and put one back with holdspeak restore. Upgrades are safe by default: HoldSpeak backs up an older database
before it touches it, and refuses to open a database written by a newer build
rather than risk your data. holdspeak doctor reports the schema and config
state it found. The full policy is in
docs/RELEASING.md.
Platform support
| Capability | macOS 14+ (Apple Silicon) | Linux X11 | Linux Wayland |
|---|---|---|---|
| Voice typing | ✅ | ✅ | ✅ |
| Global hotkey | ✅ | ✅ | ⚠️ Best effort |
| Cross-app typing | ✅ | ✅ | ⚠️ Best effort |
| Meeting mode | ✅ | ✅ | ✅ |
| System audio capture | ✅ BlackHole | ✅ Pulse/PipeWire | ✅ Pulse/PipeWire |
Wayland often blocks global hooks and synthetic typing, so HoldSpeak falls back to clipboard paste for injection.
Meeting intelligence, a little deeper
Record a meeting live, or bring one you already have: import a recording
(WAV out of the box; compressed formats with ffmpeg) or a transcript file
(.vtt, .srt, .txt) from the archive page or with holdspeak import call.wav, and it becomes a real meeting, run through the same intelligence.
The transcript is scored for intent (architecture, delivery, product,
incident, comms), a chain of plugins runs, and each one calls your LLM to
produce a typed artifact. The results render read-only at /history.
HoldSpeak ships 14 built-in plugins, all real and backed by an LLM.
Plugins can also propose actions. An actuator proposes an external side effect, like filing a ticket or posting an update, that only runs after you approve it for that specific action. Actuators are off by default. Write your own with the Plugin Authoring guide; for endpoints and routing, see the Meeting Mode Guide.
Then close the loop. Meeting aftercare shows what is still open (by owner), what was decided, and what changed since the last meeting. Jump to the transcript moment that justifies any result, file an accepted action as a human-approved issue through that same actuator flow, or draft a copyable follow-up. It is read-only and local: nothing is sent, and nothing runs, without your approval. See the Meeting Mode Guide.
Companions
HoldSpeak runs as a desktop hub, and a companion on another device drives it over the same local HTTP API your browser uses, on your own network (LAN or Tailscale), with no hosted relay. Two companions exist today.
The iPad app
The iPad is a first-class client of both modes, not a remote control for one. It talks to the hub through typed clients over the existing API: it dictates an answer into your desk (the hub runs that text through the full dictation pipeline, applying your corrections and routing, and types the result, and a matching voice command fires there too), previews the rewrite before anything types (an opt-in receipt: what you approve is exactly what lands, verbatim), authors the voice command board itself (every action still runs on the Mac, and the board says so), pins your spoken language and your spoken-symbol dictionary on that dictation path, reads a meeting back with its artifacts, confidence, and sources, closes the meeting's loop from the aftercare digest (an accepted action item becomes a GitHub issue proposal, typed against a repo you name inline), reviews every pending proposal for a meeting wherever it was created (the human gate stays its own step, and approving a Slack send carries the cloud mark because that approval executes), searches and filters the archive with the same facets the web has (narrowed on the hub, never a stale page filtered locally), imports a recording or transcript file into the hub's full intelligence pipeline (the new meeting appears immediately, honestly marked importing), reads the learning digest and the dictation journal with their real "learned from N similar" reach, and pulls activity pre-briefing nudges whose "Dictate with this" grounds the next utterance in the cited record. Its trust surface is the same one badge the desktop wears: every desk object carries its real posture (a connector reads cloud with its target named, dictation to your desktop reads local plus that machine, a note reads on device), the app's header states the desktop's posture in the web chip's own four words, and a guard holds Apple product copy to the same canonical names and no-privacy-prose rule as the docs and the web. Its on-device storage is schema safe the same way the desktop is: it backs an older database up before migrating, and refuses to open one written by a newer build. A readiness section in its Settings states that store's health (schema version, integrity, a refused newer database named as exactly that) beside your desktop's own doctor readout, section by section, so the iPad can tell you it is healthy without a trip to the Mac. The app itself is not released yet; the screens and the typed client layer they ride on are built and tested.
AIPI-Lite
AIPI-Lite is an optional ESPHome-based device you can carry between rooms. Put it on Wi-Fi (a phone hotspot works), and it gives you meeting-capture controls and status feedback. With Claude/Codex hooks on, it tells you when an agent is waiting so you can speak the reply back into the coding session. Buy the hardware from the official page or the Amazon listing; firmware and bridge setup are in the AIPI-Lite Developer Workflow.
Where to go next
| I want to… | Read this |
|---|---|
| Browse all the docs | Documentation index |
| Understand how it works, with diagrams | Architecture |
| Get it running and verify my setup | Getting Started |
| Choose / configure a model | Models (bring your own) |
| Live on the Desk (the web front door) | The Desk |
| See speech become a project-grounded task | The Dictation Copilot |
| Set up the dictation pipeline for Codex / Claude | Dictation Pipeline Setup |
| Review, correct, and replay past dictations | The dictation journal & replay |
| Map spoken keywords to real actions | Voice Commands |
| Turn on Qlippy, the mascot | Qlippy |
| Use meeting mode and configure AI intelligence | Meeting Mode Guide |
| Drive HoldSpeak from another device | Companions |
| Wire up the AIPI-Lite companion | AIPI-Lite Developer Workflow |
| Install Claude / Codex agent hooks | Agent Hook Install |
| Understand what's stored and what can leave my machine | Security & Privacy |
Configuration
Config lives at ~/.config/holdspeak/config.json, but you rarely edit it by hand.
The Settings page in the web runtime exposes the hotkey, model, meeting intel,
dictation pipeline, and presence options. The full reference is in
Getting Started and the guides above.
Contributing
Contributions are welcome. See CONTRIBUTING.md for setup
(uv, the git hooks, the test command) and the commit-contract workflow. Recent
changes are in CHANGELOG.md. If you want to build on
HoldSpeak rather than just use it, the
Plugin Authoring guide and
Connector Development are the doors in.
License
Licensed under the Apache License 2.0. See LICENSE.
Metadata
Release files for holdspeak 0.4.0
For a detailed explanation of source distributions (sdists) and built distributions (wheels), please see the package formats documentation.
Source distribution (sdist)
| File | Size | Uploaded | Provenance | |
|---|---|---|---|---|
| holdspeak-0.4.0.tar.gz | 1.8 MB | With provenance | Details |
Built distribution (wheel)
| File | Interpreter | ABI | Platform | Reset |
|---|---|---|---|---|
| holdspeak-0.4.0-py3-none-any.whl | Python 3 | none | any | Details |
Total release size: 6.4 MB
Release files / holdspeak-0.4.0.tar.gz
| Download URL | holdspeak-0.4.0.tar.gz |
|---|---|
| Size | 1.8 MB |
| Tags | Source |
|
SHA-256 checksum How to use checksums |
dd1607680a4b25cc4c4343751b729e4cde9ccbcef54f0d96c78f2d449ed75a3e
|
|
BLAKE2b-256 checksum How to use checksums |
c2e8942ff219eaaa9547a95fe89d9d6a8ae013b14d13398e790ea92422202ceb
|
| Upload date | |
|
Uploaded using Trusted Publishing? What is trusted publishing? |
Yes |
| Uploaded via |
twine/6.1.0 CPython/3.13.12
|
Provenance
Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.
PyPI Publish Attestation
PyPI verified that this artifact, at this checksum, originated from the publisher listed below.
Signed by GitHub Actions, verified by PyPI on Jul 4, 2026.
Transparency logRelease files / holdspeak-0.4.0-py3-none-any.whl
| Download URL | holdspeak-0.4.0-py3-none-any.whl |
|---|---|
| Size | 4.6 MB |
| Tags | Python 3 |
|
SHA-256 checksum How to use checksums |
90d1669db2553c966c127a5c53d47dff8fb05df4b8b169426e6c21858aac9596
|
|
BLAKE2b-256 checksum How to use checksums |
6822ba172326166ea18583ca59bdf85fd5ca309e80963a8824a96d8f71d07c97
|
| Upload date | |
|
Uploaded using Trusted Publishing? What is trusted publishing? |
Yes |
| Uploaded via |
twine/6.1.0 CPython/3.13.12
|
Provenance
Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.
PyPI Publish Attestation
PyPI verified that this artifact, at this checksum, originated from the publisher listed below.
Signed by GitHub Actions, verified by PyPI on Jul 4, 2026.
Transparency logSecurity for holdspeak 0.4.0
Provenance
Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.
Full provenance
All 2 files in this release have been uploaded with provenance metadata.
Attestation for holdspeak-0.4.0.tar.gz
PyPI Publish Attestation
PyPI verified that this artifact, at this checksum, originated from the publisher listed below.
Signed by GitHub Actions, verified by PyPI on Jul 4, 2026.
Transparency logA note on package security
PyPI is a repository for distributing packages, not a service for auditing them. While third-party security researchers and our staff do their best to detect and remove malicious packages, PyPI cannot guarantee the quality, security or suitability of any given package.