Skip to main content

Mneme HQ

Mneme is an open decision and control layer for agentic software development.

It turns durable engineering decisions into agent context, deterministic enforcement, and inspectable enforcement results across AI coding agents, repositories, and CI workflows. Architecture is the first supported decision domain: Mneme prevents architectural drift by turning architectural decisions and ADRs into deterministic guardrails across coding agents, repository mutations, generated rules, and CI gates.

Tests PyPI Python License: MIT

Where is your architecture actually enforced? Run the Architecture Audit to see which decisions are protected, which can become deterministic guardrails, and which still depend on someone remembering the rules. Try it →

Mneme is the decision layer behind that drift-prevention mechanism. It keeps recorded engineering decisions active as AI coding systems propose and modify code, instead of leaving ADRs as passive documentation.

Where the decision layer sits: engineering intent (ADRs, standards, review policies) flows into the Mneme decision layer, which reaches AI coding agents, editors and the CLI, and GitHub CI, each returning a guide, warn, or block verdict traced to its source decision. Deployment platforms and policy engines are shown dashed as planned.

Solid surfaces ship today; dashed surfaces are planned. Support levels per integration: integrations matrix.

Current phase: Layer 1 validation. Retrieval, enforcement, and benchmark semantics are governed by the accepted architecture and freeze record. See Current Phase before changing core behavior.

What Mneme does

Mneme separates architectural guidance from deterministic enforcement:

  • Records architectural decisions in a structured, auditable decision corpus.
  • Retrieves relevant decisions when an agent or model needs architectural guidance.
  • Enforces governed rules deterministically under explicit applicability semantics.
  • Integrates at the earliest reliable boundary exposed by each coding workflow.
  • Audits bypassable mutation paths where pre-change blocking is not technically available.
  • Runs in CI as a final deterministic gate before incompatible changes are accepted.

The same input and governed decision state produce the same enforcement result. Mneme does not depend on an LLM judge for its core allow/warn/fail decisions.

Mneme is not a general-purpose vector store, conversational memory system, autonomous coding agent, or deployment observability platform.

Install

Requires Python 3.11+.

pip install mneme-hq

Verify the CLI:

mneme --help

For repository development:

git clone https://github.com/MnemeHQ/mneme.git
cd mneme
pip install -e ".[dev]"

Decision MCP

Mneme exposes the Decision Index over a local MCP server so MCP-capable clients can propose candidate architectural decisions and query decision state without gaining authority to change that state.

Install the optional MCP dependency:

pip install "mneme-hq[mcp]"

Start the local stdio server. Canonical reads come from the persisted Decision Index in .mneme/project_memory.json by default; the proposal store remains separate.

mneme decision-mcp

Use --memory to select another project memory file. The file must contain a valid authoritative decision_index section; MCP fails closed rather than reconstructing authority from the compatibility decisions[] snapshot.

mneme decision-mcp --memory path/to/project_memory.json

Memory created by mneme init or mneme setup already carries an empty decision_index section and needs no migration. An older file with no decision_index section yet makes MCP stop with an error that tells you to migrate. Preview the migration first. It writes nothing and lists the visible effects: non-active decisions leave Layer 1, and legacy rule/anti_pattern items are migrated once.

mneme decision-index migrate --memory path/to/project_memory.json

Then apply exactly that migration:

mneme decision-index migrate --memory path/to/project_memory.json --apply

Migration is lossless or it refuses. There is no force or repair mode. Memory containing legacy decision metadata that the canonical index cannot represent, such as EventCatalog-imported decisions, stays on the section-less path and is not migrated.

--adr-dir is now optional validation input only. Mneme still validates and precedence-resolves that corpus before startup, but ADRs do not become a second MCP authority source.

mneme decision-mcp --memory path/to/project_memory.json --adr-dir path/to/adrs

The MCP surface is intentionally frozen to six tools:

  • decision.propose
  • decision.propose_batch
  • decision.get
  • decision.search
  • decision.applicable_to
  • decision.trace

Proposal tools create non-authoritative proposals only. Read tools query proposal and canonical decision state. MCP deliberately exposes no accept, reject, activate, supersede, exception, bypass, or trusted-evidence authority.

Human authority remains explicit through mneme decision proposals | show | accept | reject. Accepting a proposal materializes a canonical decision; it does not activate protection or run the Architecture Audit.

See ADR-027 and the v0.9.0 release notes for the authority boundary and release contract.

Architecture Audit

See where your architecture is actually protected — and where it still depends on people remembering the rules.

Mneme audits your repository and shows which architectural decisions are:

  • Protected — already enforced mechanically
  • Mneme-ready — can be turned into a deterministic guardrail
  • Requires modelling — important, but not yet safe to automate
  • Guidance — useful context, but not something that should be enforced

Run an audit:

mneme audit --memory .mneme/project_memory.json --repo-root .

For a Mneme-ready decision, validate the proposed protection before enabling it:

mneme protect validate <decision-id> --memory .mneme/project_memory.json

Then explicitly activate it:

mneme protect activate <decision-id> --memory .mneme/project_memory.json

Mneme only reports a decision as Protected after it can verify that real enforcement is in place. The full activation contract is documented in Protection Activation.

Try the Architecture Audit →

60-second enforcement example

Initialize a project-local decision corpus:

mneme init

Record one architectural decision:

mneme add_decision \
  --memory .mneme/project_memory.json \
  --id config-format \
  --decision "Use JSON for configuration files" \
  --scope config \
  --constraint "Use JSON only" \
  --anti-pattern "Do not use YAML"

Create a proposed input that violates it:

python -c "import pathlib; pathlib.Path('prompt.txt').write_text('Set up a new YAML config file', encoding='utf-8')"

Run the deterministic check:

mneme check \
  --memory .mneme/project_memory.json \
  --input prompt.txt \
  --query configuration

In strict mode, the prohibited YAML proposal returns a FAIL verdict and exit code 2. A compliant JSON proposal returns PASS and exit code 0.

The CLI is the common enforcement surface. Agent integrations translate their native events into the same Mneme decision and enforcement model.

Setup mode (no enforcement)

mneme setup initializes Mneme in a repository without changing how the team works: it creates or detects project memory, detects supported agent environments, and reports protection readiness — all without enabling any blocking enforcement. Setup never turns warn/observe behavior into blocking behavior; activation of preventive enforcement is always a separate, explicit decision.

mneme setup

Optionally record an opaque Architecture Audit reference so the setup can be attributed back to a saved Audit baseline:

mneme setup --audit-ref <reference>

Setup is idempotent: rerunning it against an existing Mneme project leaves valid configuration untouched.

How it works

Architectural decisions / ADRs
            |
            v
   structured decision corpus
            |
      +-----+--------------------+
      |                          |
      v                          v
relevant guidance       deterministic enforcement
   retrieval             + applicability checks
      |                          |
      +------------+-------------+
                   |
                   v
       workflow-specific boundary
                   |
      +------------+-------------+
      |            |             |
 pre-change     post-change      CI
   hooks          audit          gate

Mneme applies governance at the earliest reliable boundary a workflow exposes:

  1. Before generation when architectural context can be injected into the model call.
  2. Before supported file mutations when an agent exposes a blocking pre-tool hook.
  3. After bypassable mutations through bounded working-tree audits where shell/script writes cannot be inspected safely before execution.
  4. Before merge through CLI-based CI gates.

These boundaries are complementary. An integration only claims the surfaces that have been implemented and validated for that harness.

Retrieval is not enforcement

Decision retrieval answers: which architectural decisions are useful as guidance for this task?

Enforcement answers: does the proposed change violate a governed rule that applies here?

Those concerns are intentionally separated. See ADR-017, ADR-019, and ADR-020.

Supported surfaces

The authoritative support matrix lives in docs/integrations/README.md. The labels below are evidence levels, not interchangeable marketing terms.

Support level Surface
Native integration Claude Code
Native integration Claude Agent SDK
Native integration Google Antigravity
Native integration Codex CLI
Native integration Kiro CLI 3.0 / v3
Validated compatibility Paperclip — CLI and ACP transports, no adapter required
Rules export Cursor
CLI-based CI gate GitHub Actions, GitLab CI
Experimental OpenCode
Planned Deep Agents middleware POC

Each integration documents its actual blocking boundary, bypass paths, degraded behavior, and validation evidence. Start with the integration matrix, not assumptions based on another harness.

ADRs and project memory

Mneme can compile architecture decisions into structured governance records rather than treating ADRs as passive prose.

The repository governance source of truth is .mneme/project_memory.json. The ADR import path preserves explicit source provenance where available so typed rules can be inspected and enforced consistently.

See:

Architecture guarantees

Three principles govern the current mechanism:

  • Deterministic > clever. Enforcement behavior must be reproducible.
  • Auditable > autonomous. A verdict should be traceable to the decision, rule, applicability state, and evidence that produced it.
  • Prevention before review. When a reliable pre-change boundary exists, use it; when it does not, surface the limitation and audit later rather than pretending the path is blocked.

The current Layer 1 scope, frozen surfaces, accepted amendments, experimental work, and deferred Layer 2 work are maintained in docs/architecture/current-phase.md.

Do not infer architecture from this README when a linked ADR or architecture document is more specific.

Benchmark and validation

Mneme's benchmark is a regression and integrity instrument for retrieval and enforcement behavior. It is not a general model-quality benchmark.

The benchmark keeps retrieval and enforcement scoring distinct so changes cannot silently improve one surface while regressing another.

See:

Demos

More examples: mnemehq.com/demo

Contributing

Before changing retrieval, enforcement, applicability, conflict handling, or benchmark semantics, read the architecture and ADRs that govern that surface.

Core behavioral changes may require the repository's charter-amendment procedure. Documentation, tooling, integrations, and examples do not automatically authorize changes to frozen behavior.

License

MIT. See LICENSE.

Metadata

Release files for mneme-hq 0.10.0

For a detailed explanation of source distributions (sdists) and built distributions (wheels), please see the package formats documentation.

Source distribution (sdist)

Source distribution for mneme-hq 0.10.0
File Size Uploaded
mneme_hq-0.10.0.tar.gz 645.3 kB Details

Built distribution (wheel)

Table of built distributions (wheels) for mneme-hq 0.10.0
File Interpreter ABI Platform
mneme_hq-0.10.0-py3-none-any.whl Python 3 none any Details

Total release size: 1.1 MB

Release files / mneme_hq-0.10.0.tar.gz

Download URL mneme_hq-0.10.0.tar.gz
Size 645.3 kB
Tags Source
SHA-256 checksum
How to use checksums
9b3da33d61efa56a8cf66e38473bc9dff12a3b80a3025925346bd34abbb52a40
BLAKE2b-256 checksum
How to use checksums
46def4cb4c8d5fa2ba36eaba741738949b5d0f2a70bce106cf4543b3be65bc61
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
Yes
Uploaded via twine/7.0.0 CPython/3.13.14

Provenance

Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.

PyPI Publish Attestation

PyPI verified that this artifact, at this checksum, originated from the publisher listed below.

Signed by GitHub Actions, verified by PyPI on Oct 7, 2026.

Transparency log

Release files / mneme_hq-0.10.0-py3-none-any.whl

Download URL mneme_hq-0.10.0-py3-none-any.whl
Size 488.0 kB
Tags Python 3
SHA-256 checksum
How to use checksums
fc7e0ec7191e243e998055d34e5764e473aa439ecdc40c22a969acf376ec5312
BLAKE2b-256 checksum
How to use checksums
b103c53f6526ee84f7d1a19d34bc1029817e8bd2df5711d5f92cdd6cf1a4f170
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
Yes
Uploaded via twine/7.0.0 CPython/3.13.14

Provenance

Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.

PyPI Publish Attestation

PyPI verified that this artifact, at this checksum, originated from the publisher listed below.

Signed by GitHub Actions, verified by PyPI on Oct 7, 2026.

Transparency log

Release history Release notifications | RSS feed

This release

0.10.0 This release

2 release files

0.9.2

2 release files

0.9.1

2 release files

0.9.0

2 release files

0.8.0

2 release files

0.7.0

2 release files

0.6.0

2 release files

0.5.2

2 release files

0.5.1

2 release files

0.5.0

2 release files

0.4.0

2 release files

Anthropic, PBC Visionary sponsor Bloomberg Visionary sponsor Hudson River Trading Visionary sponsor Meta Visionary sponsor NVIDIA Visionary sponsor Microsoft Sustainability sponsor Depot Continuous Integration AWS Cloud computing and Security Sponsor Datadog Monitoring Fastly CDN Google Download Analytics Sentry Error logging StatusPage Status page