ofplang schedule
A scheduler for Object-flow Programming Language v0 — a YAML-based dataflow workflow IR with linear Object tracking. The language is defined in the ofplang/spec repository.
The scheduler takes one or more portable v0 workflows plus an execution environment definition and plans when their work runs; it also replans from an execution status. The design is documented in docs/SPECIFICATIONS.md.
Status: the schema validators (environment definition and execution document, spec §9) and the scheduler are implemented: it produces an optimal plan with mode selection, spot/device occupancy, and transport, lets a mode hold a spot without holding its device for storage and incubation (
device_access: false, spec §4.4.2), pins a workflow's boundary material to spots via aninterface(spec §6.8), respects device-local consumable resources — what a mode draws and what a replenishment puts back (spec §4.7) — and replans from an execution document (--document) by fixing completed/running activities and re-optimising the rest at or afternow. Several workflows can be planned together against one environment as separate jobs (spec §6.11), so they compete for the same machines and share the same stocks — a refill neither needs alone is then planned once for both. Avisualizecommand renders a plan as a self-contained SVG/HTML Gantt chart. The model is documented in docs/FORMULATION.md.
This is a fresh implementation that targets the spec directly. The prototype
ofp-scheduler (OR-Tools CP-SAT) is a reference
for ideas but not a dependency.
Install
pip install ofplang-schedule
Requires Python 3.10+. Runtime dependencies are PyYAML, OR-Tools (the CP-SAT
solver used by the scheduler), and the sibling
ofplang-validate (pulled in
automatically), which the CLI's front-door check uses. The scheduler library
never imports validate, so embedders that only call ofplang.schedule take no
validation overhead.
For development, install editable with the test extra from a clone:
pip install -e ".[test]"
Command line
ofp-schedule validate <file>... # validate an environment or a plan/status
ofp-schedule schedule <workflow>... --env <env> [--document doc.yaml] [--withdraw ID] [--carry-levels-to-now] [--running-margin N] [--max-time SECONDS] [--seed N] [--max-transport-legs N] [--no-validate] [-o plan.yaml] [--format yaml|json]
ofp-schedule visualize <plan|status> [--view device|workflow|lane] [--theme light|dark|auto] [--format svg|html] [-o FILE]
validate auto-detects whether the file is an environment definition or an
execution document (pass --kind to force it); diagnostics are reported as
file:line:col: <severity> <code>. schedule produces an execution plan (§6),
minimising the objective the document declares (§4.8; makespan, then the number of
refills). Give several workflows to plan them together as separate jobs (§6.11):
they compete for the same machines and draw on the same stocks, so a refill neither
needs alone is planned once for both. They are numbered job1, job2, ... in the
order written, or write ID=FILE to name one yourself; every activity in the plan
then carries the job it belongs to. A job may be given its own interface and a
release time in the document's jobs roster, and each is promised the completion
its first plan achieves (bound) — which later plans keep, so a job already being
planned is not disturbed by one that arrives later, and which a job that stops
has withdrawn rather than restated. Two jobs may share a loading bay where their
releases leave the first job's material time to be collected (a warning, since whether
they do is the solve's to decide); released together onto one spot, or delivering to
one spot, they cannot, and the document is refused — a plan that comes true only
because one of the jobs fails is not one to accept. A job that is not going to deliver
leaves the plan instead, in the same call that plans the next one onto its spot. Every roster entry a plan writes states its
release, 0 included: absent, a release means 0 for a job the roster names and now
for one it does not, so a plan says which. A job completes when its output
arrives somewhere it may rest; sitting there, or being moved aside later because
another job needs that spot, is not the job's work and does not move its completion.
A --document (execution document, §6) supplies the interface boundary
constraint (§6.8, where a workflow's entry inputs / final outputs sit — an entry
input has to be bound, while a final output left unbound comes to rest wherever the
schedule finds room, so bind the ones whose destination matters), the
inventories levels as of a moment it names (§6.10) where devices hold
consumables, the
objective (§6.1, now its only declaration site), the jobs roster (§6.11) and the
occupied spots something is physically holding (§6.12), and, when it sets now,
the prior status to replan from (§7) — emitting the full timeline (fixed history +
re-optimised future) that round-trips as the next status input. By default the solve is non-deterministic
(a multi-worker search that may return a different equally-optimal schedule each
run); --seed N makes it reproducible by fixing the CP-SAT seed and using a
single worker. --max-time SECONDS caps the search: the best schedule found so
far is returned instead of the proven optimum, which the plan says by reporting
outcome: feasible rather than optimal — and a search that found nothing in
the budget reports no schedule at all (exit 1), since an instance is not
unschedulable merely because time ran out.
--max-transport-legs N is how many transport activities one Object-bearing arc may
be moved in (§6.4.1). It is 1 by default — the single hop per arc this has
always planned. Raise it to describe a device the transporter reaches at one position
only, or a plate that has to cross a hand-off station: the arc is then carried in as
many legs as the shortest chain of moves between its endpoint spots takes, joined by
relay activities. Only the fewest possible moves are offered, so an arc one move
apart is never sent round by way of somewhere else.
--withdraw ID (repeatable) takes a job out of a joint plan (§6.11). The roster
is the set of jobs something of which is still in the laboratory, so an entry is
removed when nothing is — which the scheduler cannot see, hence an instruction rather
than an inference, and one refused while the document says the job still has work to
do or running. Pass no workflow for a job being withdrawn. What the job was holding is
written down before it goes (§6.12), dated when the material actually got there:
everything except a spot you bound as an output and whose product is on it, which
leaving says you collected. Only that — a delivery that failed on the way left no
product, and entry material a job never collected is material you cannot know the fate
of from outside, so both are written down rather than assumed gone. And a job that
drew on a stock since the moment inventories states its levels for cannot leave
quietly — its draws would be given back — so ask for the levels to be carried forward
in the same call.
--carry-levels-to-now restates inventories as of now (§6.10) instead of echoing
the moment it was given. The scheduler never moves that moment by itself: working
out the levels is the half it can do and you cannot, and deciding whether the history
before the moment may be let go of is the half only you can.
--ignore-resources switches consumables off (§4.7.3): the
declarations are still checked for shape but nothing is applied, and the plan is
shaped as it would be from an environment that never declared one — a relaxation,
so it never turns a solvable instance unsolvable. --no-validate skips the one-shot ofplang-validate front-door
check of the workflow — use it when the workflow was already validated upstream
(e.g. by the ofp umbrella CLI); $import is still resolved, since that is
structural rather than a validation check. visualize renders any §6 execution
document — a plan, or the status a finished run produced — as a self-contained
Gantt chart, either SVG (fixed colours, transparent background, PowerPoint-safe)
or HTML. --format chooses; without it the output is SVG, except that an -o
path ending in .html or .htm is taken as asking for HTML, and an explicit
--format always wins — --format svg -o chart.html writes SVG. Exit codes:
0 success, 1 validation errors or no feasible schedule, 2 usage/input
error.
This tool is also the schedule subcommand of the umbrella ofp CLI
(ofplang), which forwards to it in-process
with this CLI's own subcommands intact: ofp schedule schedule …,
ofp schedule visualize …, each with the same options and exit codes as above.
Feature support
v0 defines seven optional features (spec §4.2), and a document requiring one an
implementation does not have "is valid v0 but unsupported by that implementation"
(§4.1). So ofp-validate accepting a workflow does not mean this scheduler can
plan it:
| v0 feature | ofplang-schedule |
|---|---|
python_script_processes |
Supported. A script process is scheduled like any atomic one; its mode duration is the estimate of the compute cost. Running the script is the runner's job. |
scheduling_policies |
Accepted, then ignored: §23 makes these best-effort preferences, and a composite's scheduling section is dropped when the composite is flattened. The report's diagnostics carry a scheduling_policies_ignored warning. |
node_map, node_fold, node_do_while, node_branch |
Not supported. A structured node reshapes dataflow in ways the flat scheduler graph cannot represent, so it is refused with unsupported_feature. |
generic_processes |
Not supported. Refused with unsupported_feature. |
Library
from ofplang.schedule import schedule
report = schedule(workflow, environment, document_path=status) # -> ScheduleReport
Alongside the plan, the report carries stats: what the solve cost, as opposed
to what it decided — timings (including CP-SAT's machine-independent
deterministic_time), the bound the answer was measured against, and the size of
the model. It is there on every path that reached the solver, an infeasible
instance included, and None where the inputs were refused before solving.
Passing collect_solutions=True additionally records each improving solution as
the search finds it (stats.phases[-1].history), which is what an anytime
measurement — how good was the schedule at time t? — reads; it is off by default
because a solution callback runs inside the search. None of this enters the plan:
a plan is a portable v0 document and says nothing about how it was found.
Resources the instance never tells apart
Where an instance offers several interchangeable ways of using one resource — bays of a device, devices of a pool, arms that can make the same moves in the same times — its model holds a mode and a route for each of them, and every one of those choices leads to the same schedule. That grows the model quadratically in the size of such a class, and model size is what bounds solve time. It is not a small effect on a real laboratory: the standard RNA-seq case study spends three quarters of its route options choosing between four identical arms, and a growth-curve protocol run against a laboratory whose devices are written with several places to put things pays for that annotation with half its model.
So two of the three kinds are reduced away before the solver sees them. A class of interchangeable arms becomes one machine with room for as many moves at once as there are arms; a class of interchangeable bays becomes one shelf with room for as many Objects. Their modes and routes collapse to one between them, and which arm makes each move — and which bay holds each Object — is decided after the solve.
The schedule cannot change. At most that many things ever overlap, and a set of
intervals that thin can always be handed out, so every schedule the separate
resources allowed is still there and no other is added. Bays are the harder of the
two because material stays put: what gets a bay is not one interval but one
Object's whole stay — the activity that holds it, the move that brought it,
and the move that takes it away. And neither is applied where the two encodings
could differ, chiefly where an occupancy can have no length at all (a transport
may take no time, §5.4). docs/FORMULATION.md Part III sets out both, and what
makes them exact.
Measured on the benchmark, the sixty-four-job instance goes from 34,498 variables to 2,242 and enters the search for the first time; sixteen jobs solve in under two seconds where it used to take longer to prove the same answer.
Every class that is not reduced is reported instead
(interchangeable_resources, a warning), naming its members and what treating
them as one would take off. A class that is reduced says nothing, there being no
cost left to report. It is a claim about that instance rather than about the
laboratory — only the processes the workflow instantiated and the routes its arcs
kept are compared — so a resource the document has pinned something to is never
named, and a class shrinks as a run accumulates history.
Nothing about the plan changes: it names one concrete bay, machine and arm per
activity, as always. stats.model carries both sides of the count — the modes and
routes the laboratory offers, and the encoded_ ones the model was given — so the
difference is visible.
The first schedule is built, not searched for
Before the model reaches CP-SAT the scheduler constructs a complete schedule by hand — list scheduling, forward in time, each activity placed at the first moment its material, its machine and its bay are all free — and hands it to the solver as a starting point. The solver may ignore it and may improve on it. Nothing about a plan says whether it was used.
This is here because of the reduction above. Collapsing a class of interchangeable resources sharpens what the solver can prove about an instance without making any one schedule easier to find: on the two widest benchmark environments the reduced model proved the optimum in a tenth of a second and then spent a full minute without producing a single schedule worth that much. A model can carry a good bound and no witness, and a bound with no witness is not an answer. A constructed schedule is the witness.
What it is worth, on the RNA-seq case study's standard laboratory:
| before | now | |
|---|---|---|
| one job | optimal in 2.1 s | optimal in 0.6 s |
| two jobs | optimal in 71.4 s | optimal in 2.3 s |
| five jobs | nothing, after twelve minutes | a schedule at once, which two further minutes of search did not better |
The construction is not general, and does not pretend to be: it declines an
instance that refills a stock, draws on one, relays an Object between spots, starts
with material already held, replans from a reported history, or promises a job a
completion time — and the solve then proceeds exactly as it did before. Where it
runs, stats.hint_makespan is the makespan it built, and None where it declined,
so what the solver started from is visible.
It is a valid schedule, not a good one, and neither is promised. On the widest benchmark instances it is the optimum. On the five-job laboratory above it is what comes back — 1.05× the shortest makespan anything has found, and within 1.84× of what counting the work through the bottleneck says is possible.
Each input is either a path or an already-loaded document (a mapping), so an
embedder that holds them in memory — a rolling-horizon runner rendering a fresh
status every replan — passes them straight in, with no temporary files and nothing
re-parsed. An in-memory document is read, never written to, and the plan it
produces shares no structure with it. Because such a document has no file to point
at, its diagnostics carry no file:line:col and locate by their path instead,
and the plan's meta provenance reads <in-memory> unless the caller names the
original file (workflow_source / environment_source / document_source).
The package lives under the ofplang PEP 420 namespace (ofplang.schedule),
shared across the organization's tools.
derived_holds(document) answers the other question a driver of a rolling run has to
ask: which spots does this document imply are held, beyond the ones it states?
(§6.12). What a stopped job is still holding follows from its own history rather than
being declared, so the scheduler works it out on every solve — and a caller that worked
it out for itself would be a second implementation of the same rule, differing from it
in ways that show up only as an unplannable document. Deriving it is this package's;
asking is anybody's.
Examples
examples/ holds complete workflow + environment pairs used
to drive and eyeball the scheduler: a minimal source → target, a workflow with
boundary material pinned by an interface, two jobs on a two-transporter fleet, a
plate-reformatting DAG, and a parametric generator that scales the instance up.
Each comes with its solved plan and a rendered chart under examples/outputs/.
Tests
pytest
Metadata
Release files for ofplang-schedule 0.11.0
For a detailed explanation of source distributions (sdists) and built distributions (wheels), please see the package formats documentation.
Source distribution (sdist)
| File | Size | Uploaded | |
|---|---|---|---|
| ofplang_schedule-0.11.0.tar.gz | 486.4 kB | Details |
Built distribution (wheel)
| File | Interpreter | ABI | Platform | Reset |
|---|---|---|---|---|
| ofplang_schedule-0.11.0-py3-none-any.whl | Python 3 | none | any | Details |
Total release size: 703.3 kB
Release files / ofplang_schedule-0.11.0.tar.gz
| Download URL | ofplang_schedule-0.11.0.tar.gz |
|---|---|
| Size | 486.4 kB |
| Tags | Source |
|
SHA-256 checksum How to use checksums |
c6b3f0c50f424091c9726858f1e08695777e0de21fdc69d918835a24e23540c8
|
|
BLAKE2b-256 checksum How to use checksums |
cfe000c66673b2b96a2bdb765e4937e6082809c8adc1b01626b7868a9c0cf0c2
|
| Upload date | |
|
Uploaded using Trusted Publishing? What is trusted publishing? |
Yes |
| Uploaded via |
twine/7.0.0 CPython/3.13.14
|
Provenance
Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.
PyPI Publish Attestation
PyPI verified that this artifact, at this checksum, originated from the publisher listed below.
Signed by GitHub Actions, verified by PyPI on Sep 19, 2026.
Transparency logRelease files / ofplang_schedule-0.11.0-py3-none-any.whl
| Download URL | ofplang_schedule-0.11.0-py3-none-any.whl |
|---|---|
| Size | 216.9 kB |
| Tags | Python 3 |
|
SHA-256 checksum How to use checksums |
2c831e101c288e9666eeb0c26e169626f34ab1b60974ff5aaec3719d5fc8083c
|
|
BLAKE2b-256 checksum How to use checksums |
94b6dd75372dac72ffadcf44f7b12f8eefb86d2bbb39c4a99844d9dac4655e49
|
| Upload date | |
|
Uploaded using Trusted Publishing? What is trusted publishing? |
Yes |
| Uploaded via |
twine/7.0.0 CPython/3.13.14
|
Provenance
Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.
PyPI Publish Attestation
PyPI verified that this artifact, at this checksum, originated from the publisher listed below.
Signed by GitHub Actions, verified by PyPI on Sep 19, 2026.
Transparency log