Skip to main content


havn
Data in safe waters.
A self-hosted data platform built on DuckDB. Plain SQL transforms, Python ingest, one warehouse file.

Quick Start · Features · Why havn? · Docs · Contributing

License: BSL 1.1 Python 3.10+ DuckDB


License notice: havn is source-available under the Business Source License 1.1. You can read, run, modify, and use it for any internal or commercial purpose -- including in production at your company or at client sites. The one restriction is that you may not offer havn to third parties as a competing hosted or managed service. Each release automatically converts to Apache 2.0 four years after its release date (the current release converts on 2030-04-05). See the License FAQ below for details.

havn (Danish and Norwegian for harbour) is a self-hosted data platform, a Nordic alternative to Databricks and Snowflake for teams whose data fits on one machine.

The whole warehouse is a single DuckDB file. Transforms are plain SQL files with a one-line @config header; ingest and export are Python scripts. A web UI covers editing, querying, runs, checks and deploys, and every part also works from the CLI.

pip install havn && havn init my-project && cd my-project && havn jobs run full-refresh && havn serve

havn Home page: pipeline health with ten models up to date, fifteen checks passing, recent runs, and the landing, bronze, silver and gold layers

Why havn?

The usual choice is between a stack of cloud services (a warehouse, dbt, an orchestrator, an ingest tool, a catalog) and a folder of CSV exports. havn sits in between: one package you install with pip, running on a machine you control.

  • It runs where you put it. A laptop, a server or your own cloud account. Data does not leave it.
  • SQL stays SQL. Dependencies come from the FROM and JOIN clauses. There is no templating language to learn or debug.
  • Starting takes a minute. havn init creates a project with a working sample pipeline.
  • The parts are already connected. Connectors, the scheduler, checks, deploys and the web UI share one project and one warehouse.
  • Assistants can work on it. Models are plain files with simple conventions, and havn mcp gives an AI agent structured access to the project.

Features

SQL Transform Engine

Write plain SQL with a @config directive at the top. havn parses your FROM/JOIN references to build the DAG automatically (no @depends_on needed unless you want to override), runs models in topological order, and uses content-hash change detection so only what actually changed gets rebuilt.

@config materialized=table, schema=gold

SELECT
    c.customer_id,
    c.name,
    COUNT(o.order_id) AS order_count,
    SUM(o.amount)     AS lifetime_value
FROM silver.customers c
LEFT JOIN silver.orders o ON c.customer_id = o.customer_id
GROUP BY 1, 2

havn picks up silver.customers and silver.orders as upstream models from the SQL itself. Add @depends_on only when you reference a dependency through a function or string that the parser can't see. Other directives: @description, @assert <expr> for data-quality assertions, @col <name>: <doc> for column-level docs.

Python Models

A .py file in transform/ with an @model function is a DAG node like a .sql file. It builds as a table, incremental or snapshot, with the same assertions, selectors, change detection and run log. ref("schema.name") declares dependencies, and havn validate checks the file without running it. See Python models.

# transform/silver/customer_scores.py
from havn import model

@model(materialized="table", assertions=["unique(customer_id)"])
def customer_scores(db, ref):
    return ref("bronze.orders").aggregate("customer_id, sum(amount) AS score")

Governance

Row policies filter rows per role or user, using havn_user(), havn_role() and havn_attr('key'). Masking follows lineage: a column derived from a masked column is masked the same way, and @pii tags propagate downstream until @declassify. Python scripts started by a governed user run in a separate process whose db sends SQL to the server. Queries, dashboards, published links, reports and havn ask all go through the same governed read path. See Governance.

havn rls add -t silver.customers -f "region = havn_attr('region')" --roles viewer
havn pii                           # classifications, including inherited ones

Branch Warehouses

With branches.enabled, every git branch other than main gets its own warehouse that starts empty and reads any model it has not built from the base, read-only. havn ci generate writes workflows that post the data diff on each pull request. See Branches.

havn branch build                  # build only what this branch changed
havn branch diff                   # schema and row diff against the base

Dashboards, Sharing and Reports

Publish a dashboard as a read-only page at /p/<key> that works on a phone. Signed-in links run as the viewer; public links (admins only) run as a chosen user or role, can expire and be revoked. Scheduled reports send a dashboard or one widget by email and Slack on a cron schedule, with PDF, PNG and CSV attachments. See Dashboards and sharing.

havn reports list
havn reports send "Low stock" --force

Ask and Verified Agent Changes

havn ask "revenue by region last quarter" picks metrics, dimensions, grain and filters from metrics/*.yml; havn validates the choice, compiles it and runs it read-only, and shows the spec, SQL, lineage and freshness. It uses the Anthropic API or any OpenAI-compatible endpoint (Ollama, LM Studio), and sends only catalog metadata unless you opt in. Edits proposed by agents become change sets that are checked (validate, bind, unit tests, scratch build, data diff) before you apply them. See Ask.

havn ask --eval                    # measure accuracy on your own catalog
havn changes list

Performance and Telemetry

Every model build records its duration, rows, memory, spill and the plan DuckDB ran. havn perf lists slow models, regressions against a model's own history, advice with evidence, and the critical path of a run. Prometheus /metrics, OpenTelemetry traces (havn[otel]) and OpenLineage events are available and off by default. See Performance and Telemetry.

Live Models

@config live=true on an incremental model or view refreshes it within seconds of new data landing from a webhook, CDC or API-poll source, and the refresh follows downstream through live models. See Live models.

havn live status
havn live pause silver.orders

Web UI

Full-featured browser interface with Monaco code editor, interactive SQL runner, DAG visualization, data table browser, chart builder, and pipeline monitoring. Dark and light themes included.

havn serve          # http://localhost:3000
havn serve --auth   # with role-based access control

14 Data Connectors

Connect to Postgres, MySQL, BigQuery, Snowflake, Redshift, Databricks, Stripe, HubSpot, Shopify, Google Sheets, CSV, S3/GCS, REST APIs, and webhooks - from the CLI or the web UI.

havn connect postgres --host localhost --database mydb --user admin
havn connect stripe --api-key sk_live_xxx
havn connect csv --path /data/customers.csv

Notebooks

Interactive .dpnb notebooks with code cells, markdown, and inline results. Use them for exploration, or wire them into your pipeline as ingest/export steps.

Jobs and Scheduling

A job is a YAML file in orchestration/ that names what to run. havn works out the order and the upstream steps it needs, retries on failure and runs it on a cron schedule.

# orchestration/full-refresh.yml
name: full-refresh
targets:
  - gold.*
  - export/earthquake_report.py
resolve: upstream
retry: 1
schedules:
  - "0 6 * * *"

Environments and Deploys

Each environment has its own warehouse file. havn deploy prod --plan shows what a deploy would rebuild; a deploy snapshots the target first and rolls back if a model fails.

havn env use dev
havn deploy prod --plan
havn deploy prod

Git Integration & CI

Track changes with havn diff, create snapshots with havn snapshot, and generate GitHub Actions workflows with havn ci generate that post data diff comments on PRs.

havn diff                          # what would change?
havn diff --against main           # changes vs a branch
havn snapshot create before-deploy # save state
havn ci generate                   # create GitHub Actions workflow

AI-Native Design

Every project scaffolded with havn init includes context files for AI coding assistants, and havn mcp starts an MCP server they can use to read models, run queries and build.

havn context   # generate project summary, paste into any AI chat
Tool Config file Auto-included
Claude Code CLAUDE.md Yes
Cursor .cursorrules Yes
GitHub Copilot .github/copilot-instructions.md Yes
Any LLM havn context Yes

Screens

Ask: tonnes by port answered from a defined metric
Ask: questions answered from your metrics, with the SQL shown.
Governance: previewing a query as a user limited to two ports
Governance: row policies, and what a given user would see.
Performance: slowest models, advice and the critical path
Performance: build times, advice with evidence, the critical path.
A published dashboard: Port operations
Published dashboards: read-only links, embeds and scheduled reports.

Quick Start

Install

From PyPI:

pip install havn

The wheel ships the built web UI, so that is everything you need. Node and npm are only for working on havn itself.

With Docker, from a project directory:

docker run -v "$(pwd)":/project -p 3000:3000 ghcr.io/chraltro/havn

From source (for development):

git clone https://github.com/chraltro/havn.git
cd havn
pip install -e ".[dev]"
cd frontend && npm install && npm run build && cd ..
havn init my-project && cd my-project && havn jobs run full-refresh && havn serve

Adding Python libraries

Your ingest/export scripts and notebook cells run inside havn's own Python environment. DuckDB reads CSV, JSON, and Parquet natively, so you usually need nothing extra, but to use a library such as pandas, install it where havn lives:

uv tool install havn --with pandas   # if you installed havn with uv
pipx inject havn pandas              # if you installed havn with pipx
pip install pandas                   # if havn is in a regular venv

If a script or notebook hits ModuleNotFoundError, havn prints the exact command for your install method.

Create a project

havn init my-project
cd my-project

This scaffolds a complete project with a sample pipeline that fetches earthquake data from the USGS API, transforms it through bronze/silver/gold layers, and exports a report.

Run the pipeline

havn jobs run full-refresh

Explore your data

havn serve                              # open web UI at localhost:3000
havn query "SELECT * FROM gold.earthquake_summary"
havn tables                             # list all tables

Architecture

my-project/
├── ingest/              Python scripts + notebooks that load raw data
│   └── earthquakes.dpnb
├── transform/
│   ├── bronze/          Light cleanup (type casting, dedup)
│   ├── silver/          Business logic (joins, aggregations)
│   └── gold/            Consumption-ready tables
├── export/              Python scripts that push data out
├── notebooks/           Interactive .dpnb notebooks
├── project.yml          Pipelines, connections, schedules
├── .env                 Secrets (never committed)
└── warehouse.duckdb     Your entire database, one file

Data flows through four schemas:

landing/  →  bronze/  →  silver/  →  gold/
 (raw)      (cleaned)   (modeled)   (ready)

The warehouse is a single DuckDB file. Copy it, back it up, version it - it's just a file.

All Commands

Command Description
havn init <name> Scaffold a new project
havn jobs run <name> Run a full pipeline (ingest → transform → export)
havn transform Build SQL models in dependency order
havn run <script> Run a single ingest/export script or notebook
havn query "<sql>" Run ad-hoc SQL queries
havn tables List warehouse tables and views
havn serve Start the web UI
havn diff Preview what would change before running transforms
havn lint Lint SQL files with SQLFluff
havn history Show pipeline run log
havn status Project health: git info, warehouse stats, last run
havn validate Check project structure, config, and DAG for errors
havn snapshot create Save a named snapshot of project + data state
havn backup Back up the warehouse database
havn connect <type> Set up a data connector
havn watch Watch files and auto-rebuild on change
havn schedule Start the cron scheduler
havn checkpoint Smart git commit with auto-generated messages
havn metrics List and query semantic-layer metrics (metrics/*.yml)
havn mcp Start the MCP stdio server for AI agents
havn context Generate project summary for AI assistants
havn ci generate Generate GitHub Actions workflows
havn branch build/diff/status Warehouse per git branch: build what the branch changed, diff against the base
havn rls list/add/remove Manage row-level security policies
havn pii Show PII classifications, including inherited ones
havn reports list/send/preview Scheduled dashboard reports
havn ask "<question>" Answer a question from metrics/*.yml
havn changes list/show/apply Verify and apply agent-proposed change sets
havn perf Slow models, regressions, advice, critical path
havn live status/pause/resume Live models: continuous refresh
havn ci comment Post the data diff to a pull request
havn secrets list/set/delete Manage .env secrets
havn users create/list/delete Manage platform users and roles

Comparison

havn dbt + Airflow Databricks Snowflake
Self-hosted Yes Partial No No
Setup time 1 min Hours Hours Hours
Monthly cost $0 $100s+ $1000s+ $1000s+
SQL dialect Plain SQL Jinja SQL Spark SQL Snowflake SQL
Ingest built-in Yes No (need Airbyte etc.) Yes Yes
Web UI Yes Separate (Airflow UI) Yes Yes
Single-file database Yes No No No
AI-native Yes No Partial No
Data stays on your machine Yes Depends No No
Type checking + column lineage Offline, no login Needs dbt login Cloud only Cloud only
Unit tests without a warehouse Yes Experimental, needs upstreams No No

The type checking is a bind pass: havn validate hands each model to DuckDB's binder against a shadow catalog, so a missing table, an unknown column or a type mismatch is caught before anything runs. It does not execute the query, so value conversions are not caught - a VARCHAR column that happens to hold 'n/a' still fails its CAST when the model builds.

havn is made for data that fits on a single machine, which covers most teams. It is not trying to replace Snowflake at 10 TB.

For the feature-by-feature version of that answer - what works today, what works with caveats, and what isn't built yet - see What havn Supports.

Documentation

  • CLAUDE.md - Full technical reference (architecture, conventions, development workflow)
  • docs/ - User guides and the CLI and API references
  • CONTRIBUTING.md - How to contribute
  • Model docs are auto-generated from your warehouse schema and @description / @col directives, and are browsable in the web UI (havn serve)
  • havn context - Generate a project summary to paste into any AI assistant

Contributing

Contributions are welcome. See CONTRIBUTING.md for how to set up and what to expect.

# Development setup
git clone https://github.com/chraltro/havn.git
cd havn
pip install -e ".[dev]"
cd frontend && npm install && npm run build && cd ..
pytest tests/

License

havn is licensed under the Business Source License 1.1. Each release automatically converts to the Apache License 2.0 four years after its release date -- the current release converts on 2030-04-05.

BSL 1.1 is a source-available license created by MariaDB and used by projects like HashiCorp Terraform/Vault, Sentry, and CockroachDB. It keeps the full source public while protecting against commercial resale as a competing hosted service.

FAQ

  • Can I use havn at my company for free? Yes. Install it, run it, use it in production. There are no restrictions on internal use -- no user tiers, no seat counts, no "contact sales".
  • Can I modify havn for my own needs? Yes. Fork it, change it, run your modified version internally. The only thing you can't do is sell the modified version as a hosted service.
  • Can my consultancy deploy havn at client sites? Yes. Deploying and configuring havn for a client is a service, not hosting. The restriction is on offering havn itself as an ongoing hosted product.
  • What exactly is forbidden? Taking havn and offering it to third parties as a paid hosted or managed service that competes with the licensor's commercial offerings.
  • When does it become fully open source? Each release converts to Apache 2.0 four years after its release date. The current release converts on 2030-04-05.
  • Can I contribute? Yes -- see CONTRIBUTING.md. Contributions will require a Contributor License Agreement so they can be included in both the BSL core and any future commercial distribution.

Metadata

Release files for havn 0.3.0

For a detailed explanation of source distributions (sdists) and built distributions (wheels), please see the package formats documentation.

Source distribution (sdist)

Source distribution for havn 0.3.0
File Size Uploaded
havn-0.3.0.tar.gz 14.0 MB Details

Built distribution (wheel)

Table of built distributions (wheels) for havn 0.3.0
File Interpreter ABI Platform
havn-0.3.0-py3-none-any.whl Python 3 none any Details

Total release size: 28.3 MB

Release files / havn-0.3.0.tar.gz

Download URL havn-0.3.0.tar.gz
Size 14.0 MB
Tags Source
SHA-256 checksum
How to use checksums
de5381730fc68f823306f5f81c266ad4d4dff128ba27a03422ef3a10e37b835f
BLAKE2b-256 checksum
How to use checksums
10ebb421396e11314c048abdd01fe7595a5f1e8de8d9ebf61a6ffb7ed58c3baa
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
Yes
Uploaded via twine/7.0.0 CPython/3.13.14

Provenance

Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.

PyPI Publish Attestation

PyPI verified that this artifact, at this checksum, originated from the publisher listed below.

Signed by GitHub Actions, verified by PyPI on Oct 9, 2026.

Transparency log

Release files / havn-0.3.0-py3-none-any.whl

Download URL havn-0.3.0-py3-none-any.whl
Size 14.2 MB
Tags Python 3
SHA-256 checksum
How to use checksums
1f1892519f372e0aa3795e028506486ad8e1d8fc6a1f6c557c072bf1a6630be0
BLAKE2b-256 checksum
How to use checksums
95ca5aa47247dbefb72cbabdbd4c77236788b0de7b5d9a76f699454d8667eceb
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
Yes
Uploaded via twine/7.0.0 CPython/3.13.14

Provenance

Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.

PyPI Publish Attestation

PyPI verified that this artifact, at this checksum, originated from the publisher listed below.

Signed by GitHub Actions, verified by PyPI on Oct 9, 2026.

Transparency log

Release history Release notifications | RSS feed

This release

0.3.0 This release

2 release files

0.2.26

2 release files

0.2.25

2 release files

0.2.23

2 release files

0.2.22

2 release files

0.2.19

2 release files

0.2.17

2 release files

0.2.16

2 release files

0.2.15

2 release files

0.2.14

2 release files

0.2.13

2 release files

0.2.12

2 release files

0.2.10

2 release files

0.2.9

2 release files

0.2.8

2 release files

0.2.7

2 release files

0.2.6

2 release files

0.2.5

2 release files

0.2.4

2 release files

0.2.3

2 release files

0.2.2

2 release files

0.2.1

2 release files

0.2.0

2 release files

0.1.2

2 release files

0.1.1

2 release files

0.1.0

2 release files

Anthropic, PBC Visionary sponsor Bloomberg Visionary sponsor Hudson River Trading Visionary sponsor Meta Visionary sponsor NVIDIA Visionary sponsor Microsoft Sustainability sponsor Depot Continuous Integration AWS Cloud computing and Security Sponsor Datadog Monitoring Fastly CDN Google Download Analytics Sentry Error logging StatusPage Status page