Skip to main content

Personal Jarvis

Your personal AI ecosystem. One desktop, connected by voice.

Talk to Jarvis. Work with your agents. Bring your tools, models, and knowledge together.
An open-source workspace for conversations and the work that follows.

PyPI Apache 2.0 Join Discord

Personal Jarvis is an open-source AI ecosystem that runs on your own computer. At its center is Jarvis, a voice orchestrator that connects a conversation to agents, coding sessions, desktop actions, and the services you choose to connect. Speak naturally or type a message: Jarvis can answer, use a tool, or delegate work while you follow the conversation and inspect what happens. The desktop app brings those conversations, your team, and their results into one workspace on Windows, macOS, and Linux.

The workspace extends beyond the conversation. Build persistent specialists with their own instructions and recurring routines. Use Jarvis Voice to dictate into other apps. Connect plugins, skills, and MCP servers, work alongside coding CLIs, keep knowledge in a local Markdown wiki, and open generated reports, pages, and files in Artifacts. These are connected parts of the same application: a request can start with your voice, continue with an agent, and leave behind something you can read, use, or edit.

Choose the models and services that fit your work. Jarvis supports hosted providers, local models, and mixed setups. Your selected provider supplies the intelligence; Jarvis manages application state, tool access, approvals, and execution. Local speech and model options can keep supported work on your hardware. Cloud models and connected services receive the content needed for their requests; running the app locally does not make every integration offline. See privacy and local data and how the system fits together.

Website · Getting started · Documentation · GitHub · YouTube · Discord · X · Instagram

Install

Windows — PowerShell

irm https://raw.githubusercontent.com/PersonalJarvis/PersonalJarvis/main/install/install.ps1 | iex

macOS and Linux

curl -fsSL https://raw.githubusercontent.com/PersonalJarvis/PersonalJarvis/main/install/install.sh | bash

The installer checks Python 3.11+ and Git, offers to install missing prerequisites through the host package manager, installs the applicable desktop components, registers the desktop launcher, and opens the app. Language, wake phrase, and provider setup happen in the app. OS permissions and hardware capabilities affect voice and desktop control. Re-running the installer updates an existing installation.

Personal Jarvis is free and open source. Hosted models, coding subscriptions, and optional services are billed by their respective providers. Supported local models do not require a cloud model account.

Full installation, platform requirements, and uninstall instructions.

Jarvis: your voice orchestrator

Start a Voice Chat, tap the voice bar, or use your configured wake phrase. Your speech and Jarvis's replies appear in the conversation. Start a normal Chat when you prefer a keyboard.

Jarvis brings the workspace into reach: ask an agent to research a topic, work with a coding session, find something in memory, or use a connected tool. Available actions depend on your providers, installed tools, and permissions. Computer use needs a desktop and the required OS permissions.

Choose your voice and model access in the app. The voice path can use realtime audio or a speech-recognition, model, and speech-output pipeline. Your selected provider determines the available capabilities; execution and approvals remain under Jarvis's control.


Illustrative desktop conversation: the app window and sidebar stay visible as Hey George activates listening, followed by a project-planning exchange

“Hey George” → listening → conversation. The desktop window and navigation stay in view.

The demos on this page are Remotion recreations of the interface with illustrative conversations, not live recordings or response-time benchmarks. The wake phrase and listening transition above are animated to explain the interaction. Click a GIF for its sharper 60 fps video, or use the still previews and reproducible source.

Voice conversations · Wake phrase and audio · Models and providers


Your first steps in the desktop app

  1. Open Personal Jarvis. The installer opens the desktop app for you. Later, find Personal Jarvis in Windows Search, macOS Spotlight, or the Linux application menu. You do not need to keep a terminal open.
  2. Complete the in-app setup. Choose your language, review device permissions, and choose a wake phrase or a keyboard shortcut. The assistant name follows your chosen phrase: Hey George is the example above, not a required name.
  3. Connect model access. Open API Keys & Providers to connect and test a supported provider, or configure a local model. Chat needs a ready model; voice additionally needs a working realtime connection or speech pipeline.
  4. Start a conversation. Use New chat to choose Chat or Voice Chat. For voice, wait for readiness and use your wake phrase, shortcut, or the voice bar. Try: "Help me plan a small project. Ask me what you need to know."
  5. Build out your workspace. Add a specialist under Agents, connect a service in Plugins / Skills / MCP, or open Jarvis Voice for dictation. Find generated files in Artifacts and recurring work under Scheduled.

The sidebar keeps these areas within reach. More opens additional views, including knowledge, coding tools, settings, and help. Voice Chat is a conversation with Jarvis; Jarvis Voice is speech-to-text for the app you are already using.

First-run setup · First chat · First voice conversation · Desktop tour

Manual installation and headless use
git clone https://github.com/PersonalJarvis/PersonalJarvis.git
cd PersonalJarvis
python -m venv .venv

Activate with .\.venv\Scripts\Activate.ps1 on Windows or source .venv/bin/activate on macOS/Linux, then run:

pip install -e ".[full]"
jarvis          # Desktop app
jarvis serve    # Headless API and browser UI

For a minimal server installation, use pip install personal-jarvis and jarvis serve. Open the local address reported at startup; the default is http://localhost:47821. Remote browser microphone access requires HTTPS. See the headless deployment guide.

Jarvis Agents

Build a team you can return to. Each agent has an identity, a direct conversation, standing instructions, and access to the tools you grant it. Pick a connected model or supported agent account for the work, and keep the conversations in one workspace.


Agents workspace recreation: send a brief, watch the live thinking trace, then read the streaming reply and completed plan

An illustrative agent conversation, from brief to draft. The GIF plays once and holds the reply; click to replay the video.


  • Talk directly to a specialist. Select an agent from the roster and continue its chat.
  • Give it a standing brief. Configure its instructions, model access, and tools.
  • Set up recurring work. Per-agent routines expose instructions, scheduling, and execution history.
  • Inspect its work. Read messages and tool activity, and open produced files in Artifacts.
  • Explore the world view. The workspace also has a visual map of the team.

Persistent agents and isolated coding missions have different lifecycles. Coding missions can use worktree isolation and critic review; an ordinary agent chat is not a new isolated worktree on every message.

Agent guide · Agent learning · Routines

Jarvis Voice Dictation

Speak into the app you already use. Hold your dictation shortcut or toggle hands-free recording, then insert the transcript into the focused text field. Dictation is speech-to-text; Voice Chat is a conversation with Jarvis.

The Jarvis Voice section brings together dictation history, your dictionary, shortcuts, language settings, and speech-provider setup. Optional cleanup improves the transcript, translation writes into a selected language, and Prompt Mode can turn a dictation into a structured prompt. Review and recover entries in history when you need to revisit a transcript.

Choose local speech recognition to process audio on your machine. Provider-backed cleanup or translation can still send text to the configured provider.

Dictation guide · Speech dictionary · Languages and voices

Local models

Use local models, hosted providers, or a mixture. Local models helps you discover the local server, see available models, configure their roles, and check readiness. Text generation, tools, and image input have different model requirements.

Part Local option
Model and tools Ollama or a compatible local OpenAI-style endpoint. Tool support depends on the model.
Speech recognition On-device Whisper or Nemotron, with the corresponding engine and model installed.
Speech output On-device Piper voices.
Realtime conversation A compatible self-hosted realtime server; experimental, with its own hardware requirements.

Downloads, hardware needs, languages, and capabilities vary by model. External APIs, hosted coding accounts, connected services, and telephony still send the relevant work to those services.

Local AI setup · Provider setup

Coding workspace

Bring supported coding CLIs into Agentic IDE with a project folder and live terminal panes. Work with tools such as Claude Code or Codex using the access supported by that tool, and keep their sessions visible alongside the rest of Jarvis. Terminal and chat views provide different ways to follow the work.

Panes have call signs so you can address a particular session through Jarvis: "Tell T1 to run the tests" or "What is T2 working on?" Return to the workspace to inspect output, respond to a prompt, or take over manually. A terminal becoming idle is not proof that its result is correct; inspect its changes and validation.

Ordinary command-line connections are managed separately from interactive coding panes. CLIs & CLI Test Hub helps discover, configure, and test those tools before you ask Jarvis to use them.

Agentic IDE · CLI connections

Plugins, skills, and MCP

Connect the workspace to the tools you already use, and extend how Jarvis works without replacing the assistant. The Plugins / Skills / MCP hub separates three complementary kinds of extension:

Extension What it adds Learn more
Plugins Connections to supported services and their tools, with their own setup and connection state. Plugin guide
Skills Reusable instructions for a task or workflow, with explicit activation and configuration. Skill guide
MCP servers Tools supplied by local or remote Model Context Protocol servers, according to granted access. MCP connections

Connect the services you need and inspect their status in the app. A tool being listed does not establish that its account is connected or that a particular action will succeed. Authentication requirements and permissions vary by integration. For a self-hosted example, see connecting Home Assistant.

Memory and knowledge

Keep reusable knowledge in the Knowledge Wiki, a local Markdown vault with pages, links, and a visual memory map. It gives facts and notes a place beyond a single conversation, and lets you browse the material that later work can use. You can also connect the vault to Obsidian.

Profile information, contacts, and standing instructions add different kinds of context. Use them to describe preferences and people, and shape the assistant's behavior. They are editable parts of your workspace, so you do not need to repeat the same background in every prompt.

Wiki and memory · Obsidian · Profile and contacts · Instructions and persona

Scheduled work and workflows

Recurring work belongs in a schedule. Use agent routines for a specialist's recurring brief and the scheduling views to manage tasks and inspect their run history. Instructions, timing, and previous executions stay visible so you can change the work as your needs change.

Workflows and app commands provide additional ways to trigger supported actions. Scheduling depends on the relevant Jarvis runtime being available and the required providers and connections being ready; saving a schedule is not a completed run.

Routines · Tasks and reminders · Workflows and commands

Computer use and connected channels

Jarvis can interact with desktop applications through the configured computer-use path. Screen context supplies visual information; computer use goes further and can act through the mouse and keyboard. Desktop access and the required OS permissions are necessary, and actions pass through the configured safety policy.

Optional messaging channels and Twilio calling extend the ways requests and conversations reach the system. These need their own supported accounts and setup. Calling is a hosted-service capability, not an offline feature; the phone-call guide covers numbers, credentials, and webhooks.

Computer use · Screen context · Permissions

Artifacts and run history

A conversation can produce something you keep. Artifacts brings generated reports, documents, pages, images, and other files together for preview and download. Follow the output back to the work that produced it, then open or reuse it outside Jarvis.

Session history and Run Inspector help explain what happened: recorded turns, tool activity, timing, and errors. Spend shows recorded provider usage and available cost information, including supported coding-session usage. Coverage depends on what each provider and execution path reports.

Outputs and files · Sessions and Run Inspector

How it works

The desktop is a React/TypeScript interface inside a pywebview window, backed by a Python/FastAPI application. REST endpoints handle application operations; WebSockets deliver live state and activity. Headless mode exposes the API and browser interface without the native desktop shell.

Desktop, browser, voice, CLI, and channels feed the Jarvis core. It routes requests to model responses, protected tools, or delegated work, which feed live events, history, memory, and artifacts.

The execution path follows the request and available capabilities. A simple answer can stay in the conversation; a service action needs an available tool; longer work can run through an agent or mission lifecycle. Persistent agent chats and worktree-isolated missions remain distinct.

Boundary Technical role
Protocols Shared contracts in jarvis/core/protocols.py separate orchestration from provider and platform implementations.
Event bus Typed, immutable events carry trace IDs so components exchange activity without direct coupling.
Streaming providers Brain, speech, and harness interfaces stream output; realtime sessions handle live audio through their selected provider.
Tool executor A central execution path applies the risk policy and approval requirements before an action runs.
Mission lifecycle Coding missions can use isolated Git worktrees, progress events, critic review, cancellation, and retained output.
Extension points Provider plugins use Python entry points; MCP servers and connected services contribute tools through their adapters.
Persistence Conversations and run records use dedicated stores, the Knowledge Wiki uses local Markdown, and credentials use the secret-storage layer.

For the current live-voice path, see GPT-Live. For deeper engineering detail, read the architecture overview, architecture decisions, and OS parity.

Configuration, privacy, and control

Configure providers and credentials in the app. Keys use the operating system's credential store when available, with supported environment/file fallback for other setups. Keep secrets out of chat, jarvis.toml, and version control. The configuration example documents advanced settings.

Wake-word listening runs locally. Your speech and model providers determine where subsequent audio, text, and tool context are processed. The Knowledge Wiki stays in local files; integrations receive the information needed for the actions you ask them to perform.

Tool execution uses a risk policy with safe, monitor, ask, and block tiers. Permissions, approvals, and run history let you inspect and control actions.

For scripts and other agents, the CLI reaches the same application API:

jarvis system status
jarvis --json brain status
jarvis api <tag> <op>

CLI guide · Control API · Safety and approvals · Privacy · Security policy

Documentation

Open Docs in the app for searchable product guides, or follow the topics here.

Guide Contents
Getting started Installation, first conversation, and desktop tour.
Dictation Shortcuts, history, cleanup, and speech input.
Plugins Connect services and inspect their status.
Skills Reusable instructions and workflows.
MCP Local and remote tool servers.
Local AI Model setup and capability checks.
Troubleshooting Setup, connection, and device problems.
Architecture Components, data flow, and provider boundaries.
GPT-Live The native live-voice path and tool execution.
Agent learning Private, evidence-backed learning for persistent agents.
Routines Scheduling and recurring work.
OS parity Platform coverage and limitations.
Contributor guide Development setup and pull requests.
Architecture decisions Design decisions and their context.
README media source Provenance, example data, still previews, and rendering commands.

Community and contributing

Follow the project on the website, X, and Instagram.

Questions, ideas, and bug reports are welcome on Discord and GitHub. Watch walkthroughs on the Personal Jarvis channel.

Read CONTRIBUTING.md before a pull request. Hardware reports, provider integrations, accessibility improvements, and native-language feedback are especially useful. AI-assisted contributions are welcome; review focuses on the change and its evidence. Repository contributions are written in English. Report vulnerabilities privately through SECURITY.md.

Contributors

rubenluetke10-beep

Thank you to everyone who contributes. This wall is updated from commit history.

License

Apache 2.0: free to use, modify, and distribute, including commercially. See NOTICE, licensing details, and trademark guidance. Releases through version 1.6.0 retain their original MIT license.

Metadata

Release files for personal-jarvis 2.3.1

For a detailed explanation of source distributions (sdists) and built distributions (wheels), please see the package formats documentation.

Source distribution (sdist)

Source distribution for personal-jarvis 2.3.1
File Size Uploaded
personal_jarvis-2.3.1.tar.gz 27.4 MB Details

Built distribution (wheel)

Table of built distributions (wheels) for personal-jarvis 2.3.1
File Interpreter ABI Platform
personal_jarvis-2.3.1-py3-none-any.whl Python 3 none any Details

Total release size: 56.6 MB

Release files / personal_jarvis-2.3.1.tar.gz

Download URL personal_jarvis-2.3.1.tar.gz
Size 27.4 MB
Tags Source
SHA-256 checksum
How to use checksums
3b82813378dd7acaae260f09eecbf7b7d5efb790fdefec10dd2c424401809bd3
BLAKE2b-256 checksum
How to use checksums
8418b1f72de18693b8c9fd89464d2d81bef9c0ec501799aa97858eed67520f70
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
Yes
Uploaded via twine/7.0.0 CPython/3.13.14

Provenance

Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.

PyPI Publish Attestation

PyPI verified that this artifact, at this checksum, originated from the publisher listed below.

Signed by GitHub Actions, verified by PyPI on Sep 23, 2026.

Transparency log

Release files / personal_jarvis-2.3.1-py3-none-any.whl

Download URL personal_jarvis-2.3.1-py3-none-any.whl
Size 29.3 MB
Tags Python 3
SHA-256 checksum
How to use checksums
faadc32d8785c05fa5c784b0be6b8a4e380c8b05b6be1eefd676cebbb90f90a1
BLAKE2b-256 checksum
How to use checksums
a2a9199a47c67712113054dbe85c4844c322728ac6529ad69cf1f7596faffbde
Upload date
Uploaded using Trusted Publishing?
What is trusted publishing?
Yes
Uploaded via twine/7.0.0 CPython/3.13.14

Provenance

Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.

PyPI Publish Attestation

PyPI verified that this artifact, at this checksum, originated from the publisher listed below.

Signed by GitHub Actions, verified by PyPI on Sep 23, 2026.

Transparency log

Release history Release notifications | RSS feed

3.2.0

2 release files

3.1.1

2 release files

3.0.0

2 release files

2.9.0

2 release files

2.8.0

2 release files

2.7.1

2 release files

2.7.0

2 release files

2.6.0

2 release files

2.4.4

2 release files

2.4.3

2 release files

2.4.2

2 release files

2.4.1

2 release files

2.4.0

2 release files

2.3.2

2 release files

This release

2.3.1 This release

2 release files

2.3.0

2 release files

2.2.1

2 release files

2.2.0

2 release files

2.0.0

2 release files

1.6.0

2 release files

1.5.3

2 release files

1.5.1

2 release files

1.5.0

2 release files

1.4.0

2 release files

1.3.2

2 release files

1.3.1

2 release files

1.3.0

2 release files

1.2.3

2 release files

1.2.2

2 release files

1.2.1

2 release files

1.1.5

2 release files

Anthropic, PBC Visionary sponsor Bloomberg Visionary sponsor Hudson River Trading Visionary sponsor Meta Visionary sponsor NVIDIA Visionary sponsor Microsoft Sustainability sponsor Depot Continuous Integration AWS Cloud computing and Security Sponsor Datadog Monitoring Fastly CDN Google Download Analytics Sentry Error logging StatusPage Status page