Code Context Control
The local code-intelligence layer for AI coding tools.
Retrieve less, read less, edit safer — and control what an agent may read, write, or see.
Works with Claude Code, Codex, Grok Build, Copilot, Cursor, and Antigravity.
The problem
LLM-driven coding tools have one expensive failure mode: they read too much. They cat whole files, regex the entire repo, dump 10k-line logs into context, edit-and-pray, and burn through budget before they touch a single line of code. On a half-day session you can spend $20+ on token waste that adds zero value.
And they read too widely: the same agent that greps your source also greps your .env, your customer CSV, and your production dumps.
What C3 does about it
A thin local layer between your IDE and your repo. Every AI tool call is routed through a narrow, surgical operation instead of a broad, wasteful one:
| Without C3 | With C3 |
|---|---|
Read the whole 2,000-line file |
c3_compress returns a structural map at 40-70% of the original token count → c3_read(symbols=...) for the exact function |
Grep the whole repo blindly |
c3_search returns ranked candidates with TF-IDF + symbol awareness |
Dump full pytest output into the prompt |
c3_filter distills 500 lines → 30 actionable ones |
| Edit, hope it compiled | c3_edit writes via a ledger + c3_validate runs pyright/tsc automatically |
Bash test runs that hang on Windows |
c3_shell returns structured {exit_code, stdout, stderr, duration} with auto-filter |
Lose all context on /clear |
c3_session(snapshot) + c3_memory persist decisions across sessions |
| Re-explain the project every session | Auto-synced CLAUDE.md / AGENTS.md / copilot-instructions.md from one source of truth |
Agent reads .env, a customer CSV, a prod dump |
Access Guard denies the path outright, or Mask Guard serves a redacted view |
Everything runs locally. No source code, prompts, or model output leaves your machine unless you explicitly opt into a third-party model API.
Install
Requires Python 3.10+. Recommended via pipx:
pipx install code-context-control
c3 init /path/to/your/project
Or pip install "code-context-control[tui]" for the optional Textual UI.
c3 init walks you through IDE selection (Claude Code, Codex CLI, VS Code, Cursor, Antigravity, Grok Build, or Custom), optional git init, MCP registration, and — for Claude Code — a permission tier. Headless:
c3 init /path/to/project --force --ide claude --mcp-mode direct --permissions standard
c3 init /path/to/huge-repo --force --no-embed # skip the embedding index on large repos
c3 init /path/to/project --force --rebuild-index # re-index from scratch (default re-checks files and reuses the index)
Upgrade with c3 upgrade (or pipx upgrade code-context-control). MCP is wired through the c3-mcp entry point, so upgrading needs no per-project reconfiguration.
For native Codex hooks, thread continuity, and additive installation alongside
Claude Code, see the Codex integration guide. Run
c3 install-mcp --ide codex, review hook trust in Codex, then check
c3 doctor --ide codex. Existing installations need this reinstall to receive
the new host arguments and hooks.
For xAI's Grok Build CLI, see the Grok integration guide.
Run c3 install-mcp --ide grok, launch grok --trust once in the project (Grok
loads no project MCP servers, hooks or AGENTS.md until the folder is trusted),
then check c3 doctor --ide grok.
Upgrading from before v2.60.1 on Windows: existing projects are not repaired by upgrading — re-run
c3 initonce per project to fix hook registration.
Full notes: Upgrading · Contributing
The UI
Three local web apps, no Electron — pure Flask + vanilla JS: the Hub (c3 hub, port 3330), the per-project UI (c3 ui), and the optional Oracle (c3 oracle serve). Both servers can run as windowless login services — c3 hub --install, c3 oracle serve --install, or the buttons in Hub → Settings.
Project Hub — multi-project mission control
Every C3-initialized project registers itself here on c3 init. Filter by active/idle, see IDE / version / port / last activity per row, and launch your IDE or the project UI in one click. Ctrl+K searches code and memory across every registered project.
Three top-level views — Projects, Tasks (a cross-project kanban), and Credentials — plus a drill-in panel per project covering Overview, Sub-projects, Tasks, Artifacts, Memory, Ledger, Sessions, Health, Budget, Credentials, Config, and MCP.
Sessions (v2.143.0) lists past Claude Code sessions across projects: the title, first and last prompt, the agent's note, and linked tasks and decisions. Resume opens a terminal running claude --resume <id>, or you can copy the command or open the claude.ai/code link. Agents mark dead ends stale with c3_session(action='stale'). → Sessions
Sub-projects make one project a first-class child of another, with its own .c3. It can be a nested repo — the parent's index then excludes its subtree — or a project anywhere else on disk, linked by path. Hierarchies nest up to 8 levels, and c3_search / c3_memory fan out on demand (scope='all', or one by name). → Sub-projects guide
Per-project UI
c3 ui # binds the first free port from 3333
Twelve tabs. The dashboard above shows token savings, indexed files, the live session, and a stream of recent tool calls and file changes.
Since v2.128.0 you rarely start it by hand: opening an IDE session in a registered project brings its UI up, and a session proves it is alive with a heartbeat rather than with tool-call traffic — so a quiet session stays live and a closed one disappears at once. Servers a session started are reaped once the session is gone; the ones you started are not. → Session liveness
| Tab | What it's for |
|---|---|
| Dashboard | Token savings, codebase breakdown, live session counters, recent activity |
| Chat | Browse and search indexed IDE chat transcripts |
| Sessions | Every session with duration, decisions, files, tool calls, token cost |
| Memory | Durable facts across sessions — categories, semantic search, list ↔ graph |
| Tasks | Per-project PM: dependencies, milestones, time tracking, health |
| Edits | The Edit Ledger — every AI-driven change, versioned and restorable |
| Bitbucket | PRs, branches, activity, admin against Bitbucket Data Center |
| Jira | My Work board, JQL search, transitions, comments |
| Credentials | Named secrets — metadata only, values are never returned to the browser |
| Access Guard | Path rules: deny / read-only / mask, plus the path tester |
| Instructions | One editor for CLAUDE.md, AGENTS.md, copilot-instructions.md |
| Settings | Budgets, feature flags, background agents, delegate routing, MCP |
Tasks (v2.45.0, extended v2.53.0) is a durable per-project tracker — dependencies and subtasks, milestones, decision notes, full event history, health reports, and both automatic and manual time tracking. It rolls up into the Hub's cross-project board. Shipped milestones can be completed (v2.86.0) — they leave the board while their tasks keep the milestone link, unlike archiving, which detaches them.
Instructions keeps your agent-facing docs in sync. C3-generated content sits inside a <!-- C3:BEGIN … --> block; anything you write outside it is preserved. Since v2.60.0 generated docs point at .c3/MAP.md — a machine-owned, byte-stable repo map C3 refreshes automatically — instead of embedding a tree that goes stale. AGENTS.md serves Codex, Grok Build and Antigravity; GEMINI.md is read if present but no longer generated (the Gemini CLI profile was removed in v2.52).
The MCP tool suite
C3 exposes 21 tools as a native MCP server. Your IDE calls them directly:
| Tool | What it does |
|---|---|
c3_search |
TF-IDF / regex / semantic search, ranked; fans out to sub-projects with scope= |
c3_compress |
AST-based file map (map, dense_map, smart, diff, bug_scan, ast) |
c3_read |
Surgical reads — by symbol name, regex, or line ranges |
c3_edit |
Atomic patch with ledger logging + content-addressable history |
c3_validate |
Type / syntax check (pyright, tsc, ruff — auto-detected) |
c3_filter |
Distill long terminal/log output via pattern + LLM summarization |
c3_shell |
Shell commands with structured returns + auto-filtered stdout |
c3_status |
Views: budget, health, notifications, sessions, ghost_files, access |
c3_memory |
Fact store with categories, recall, graph queries, index→fetch two-step |
c3_session |
Snapshot, restore, log decisions, compact history |
c3_impact |
Blast-radius analysis before editing shared symbols |
c3_locks |
Agent leases — who is working on which file, so two agents don't collide (v2.65.0) |
c3_ci |
Run this repo's real .github/workflows locally — in containers via act — with structured failures, before pushing (v2.79.0) |
c3_delegate |
Offload heavy work to local Ollama / Codex / Gemini / Grok |
c3_agent |
Workflows: review_changes, investigate, preflight, prepare_context, validate_compress |
c3_edits |
Edit-ledger queries, version diffs, restore points, per-branch filter, verify (did a failed c3_edit still land?) |
c3_task |
Per-project PM — tasks, dependencies, milestones, time tracking (v2.53.0) |
c3_artifacts |
Agent-config version history, diff & restore (v2.46.0) |
c3_credentials |
Named-secret vault; values never enter model context (v2.58.0). import_env bulk-imports a .env the agent still cannot read (v2.93.0) |
c3_bitbucket |
Bitbucket Data Center — PRs, branches, builds, admin (v2.30.0) |
c3_jira |
Jira Cloud + Data Center — JQL, issues, transitions (v2.56.0) |
c3_project |
Cross-project discovery & operations; sub-project hierarchy (link by path, inspect, multi-level tree); guarded writes (v2.31.0) |
Every tool is read-only safe in plan mode except c3_edit, c3_shell, c3_ci(action='run'|'rerun'), c3_artifacts(action='restore'), c3_delegate with write delegation enabled, and write actions on c3_bitbucket / c3_jira / c3_credentials / c3_project / c3_task / c3_locks.
On Windows c3_shell uses Git Bash when available. Git Bash bundles no jq; use python -m json.tool for portable JSON formatting.
Guards — what the agent may touch, and what it sees
Two questions, two answers. Access Guard (v2.62.0) answers may the agent touch this path? Mask Guard (v2.63.0) answers what should it see when it does?
c3 access add "secrets/**" --kind deny # never read, never write
c3 access add "migrations/**" --kind read_only # readable, never written
c3 access mask add "data/*.csv" --preset sample_rows --params "count=20,strategy=first"
c3 access mask activate # purge pre-mask artifacts, build views
- AWS_KEY = "AKIAIOSFODNN7EXAMPLE" # your file
+ AWS_KEY = "«c3:redacted:aws_access_key»" # what the agent sees
- Tighten-only. No allow list exists; global and project scopes merge as a union, so a cloned repo's config can only add protection.
denymeans deny-enumerate too — denied paths never appear in search results, maps, or the vector index.- Masked means read-only, always. Cropped rows have no inverse, so an edit in transformed coordinates would corrupt the one file you protected.
- Four deterministic presets, no LLM in the read path:
redact_secrets,redact_columns(salted one-way pseudonyms — joins survive, no reverse dictionary),sample_rows,signatures_only. - Sensible defaults out of the box (v2.86.0). A fresh install seeds
*.pem,id_rsa*, and*.keyas deny rules in global scope — visible inc3 access listand removable like any rule you wrote yourself. Delete one and it stays deleted. - Rule changes are human-only (UI tab or CLI) and ledger-logged. Agents have no mutation surface.
- Built-ins can be switched off when you need to (v2.65.0).
**/.env*,**/.c3/**,**/.claude/settings*.jsonand**/.git/**yield toc3 access builtin disable <glob>, which makes you retype the glob first. It takes two keys — a config entry and a keyring attestation — so an agent that manages to writeconfig.jsonstill cannot grant itself write access to your settings. The credential vault stays absolute. - Honest coverage. This guards cooperative agents against mistakes and prompt injection. It is not a sandbox — a raw shell outside C3's tools still sees the real bytes.
Agent Locks — several agents, one repo (v2.65.0)
Guards answer may the agent touch this? Locks answer is someone already touching it?
Two agents editing one file used to be silent data loss. c3_edit serialized
same-file edits with an in-process lock, but every session runs its own c3-mcp
server — so two sessions could interleave read → replace → write and lose an edit
with no error on either side. Create mode was worse: both agents "succeeded" and
one file won.
Now there are two mechanisms, because they solve different problems:
- Torn writes — a cross-process file lock, held across create, single-edit and batch alike. No daemon, no configuration, nothing to switch on.
- Overlapping work — a lease.
c3_edittakes one on the file it edits, carrying the intent from your edit summary. A second agent gets told who holds it and why:
[c3-lock:held] services/router.py is held by claude-code:a3f19c2b.
intent: "refactor retry backoff"
lease expires in 6m12s.
c3 locks list # who holds what, across the project
c3 locks force-release services/router.py # break a stuck lease (human-only, audited)
- TTL is the real release mechanism. Agents forget to release, so nothing assumes they will — a crashed agent can never wedge a repo.
- Acquisition is all-or-nothing over a sorted path list, so two agents grabbing the same pair in opposite order cannot deadlock.
force-releasebumps a fencing counter, so a holder that comes back is stale by construction rather than by hope. It lives in the CLI and the Hub, never in the agent-facing tool.- The Hub's Locks tab badges a project it cannot read as
UNREADABLE, not as zero leases — "all clear" is a different claim from "we don't know". - Honest coverage, again. Leases gate C3's own tool surfaces. A raw
c3_shellredirect, a non-Claude agent, or a human in an editor is not covered, and the UI says so on screen.
Set locks.enabled: false in .c3/config.json to opt out.
Integrations
| What you get | Guide | |
|---|---|---|
| Credential vault (v2.58.0) | Named secrets, global + per-project, in the OS keyring. Agents use them by name — env_creds='NPM_TOKEN' or {{cred:NAME}} — and values are decoded only at the subprocess boundary, never in model context. Hub-wide Credentials view since v2.59.0. |
guide |
| Bitbucket DC/Server (v2.30.0) | PRs, branches, builds, repo admin over REST + PAT. Merges and branch deletes land in the edit ledger. | guide |
| Jira (v2.56.0) | Cloud (REST v3) and Data Center (REST v2) behind one tool: raw JQL, My Work board, transitions, comments, and an Activity view linking ledger work to issue keys. | guide |
| Oracle Discovery API (v2.32.0) | Expose cross-project code + memory intelligence as tools for an external LLM, over MCP (:3332/mcp) or OpenAPI REST (:3331/api/discovery). Read + safe-action tools only, Bearer token in the keyring. |
guide |
All tokens live in the OS keyring (Windows Credential Manager, macOS Keychain, Linux Secret Service) — never in .c3/config.json. Each supports login --global so one login is reusable across every C3 project.
Tiered local AI (optional)
Optional Ollama integration so the primary model doesn't spend context on grunt work:
| Tier | Model class | Used for | Latency target |
|---|---|---|---|
| Nano | qwen2:0.5b |
Intent routing, classification | <100 ms |
| Micro | deepseek-r1:1.5b |
Last-turn Q&A, summarization | <1 s |
| Base | llama3.2:3b+ |
Code analysis, technical reasoning | <5 s |
c3_delegate(task="summarize this 4k-line stacktrace", backend="ollama")
c3_delegate(task="rate-limit refactor", backend="auto") # picks the right tier
Ollama is fully optional. C3 works without it.
Permissions (Claude Code)
C3 manages .claude/settings.local.json with three tiers:
| Tier | What it allows |
|---|---|
read-only |
Exploration only — no file writes, no git writes, no installs |
standard |
Normal dev workflow — edit, build, test, local git (recommended) |
permissive |
Full trust — everything except destructive ops |
c3 permissions show
c3 permissions standard
All tiers allow C3's MCP tools and include a hard deny list (rm -rf, sudo, git push --force). Switching a tier preserves your own allow/deny rules — only C3-managed entries are replaced. The same applies to .mcp.json and your hooks.
Benchmarks
Every number C3 advertises is reproducible on your own machine, against your own project:
c3 bench session # six realistic workflow scenarios, A/B with vs without C3
c3 benchmark /path/to/project # per-operation micro-benchmarks
c3 bench aider # Aider Polyglot suite (external; burns real API tokens)
c3 bench swe # SWE-bench Lite (external)
The session benchmark's baseline models a competent agent working without C3 — one targeted search, each file read once — and scores answer quality alongside tokens. Runs against C3's own repository land around ~50% token savings (2×) at quality parity — 51.8% at v2.43.0, 49.9% at v2.63.2, with C3 scoring 98.8% on answer quality against the baseline's 96.5% in both. File sampling is deterministic (largest files first, no RNG), so a given commit reproduces the same figure. Your numbers will differ with your project's shape; that's why the harness ships with the tool.
C3 also records real per-tool usage to .c3/tool_telemetry.jsonl, so estimates can be checked against what actually happened.
Security & privacy
- All web servers bind
127.0.0.1by default and are guarded against browser-based attacks even on loopback — a Host-header allowlist (defeats DNS rebinding) plus an Origin/Referer check on every request (defeats cross-origin CSRF), with scoped, non-wildcard CORS. There is still no user authentication, so do not expose these servers to an untrusted network without auth/TLS in front. Binding to a non-loopback interface is opt-in and warned at startup. (Hardening added in v2.33.0.) - Mobile gateway (
/api/mobile/*) — the Oracle exposes a companion-app surface for the C3 mobile app: merged cross-project feed, project overview, PM board read/write, digest, notification ack, plus the security surface (credential vault, Access Guard rules and masks, tool discipline). Unlike the legacy Oracle GETs it requires a Bearer token on every method, GETs included — the Discovery token, or (v2.125.0+) a per-client token: one credential per paired device, stored hashed in~/.c3/oracle/clients.json, revocable one at a time, and carrying a kind (mobileordesk) that override decisions are audited under. It validates every project path against the registry, and audits every write to the project's activity log and edit ledger. Pair the app from Oracle Settings → Mobile app (the QR carries the URL and a freshly minted per-device token; a legacy Discovery-token code is one button away). A same-machine client such as C3 Desk pairs itself withPOST /api/mobile/clientsand the owner-only~/.c3/oracle/bootstrap.key. Remote reachability is the same recipe as the Discovery API: setbind_hostto the Tailscale/LAN interface IP (avoid0.0.0.0) and list that address inallowed_hosts, both in~/.c3/oracle/config.json; with such a bind the Oracle also listens on127.0.0.1(loopback_listener, default on) so local clients are not refused. Disable the whole surface with"mobile_api_enabled": false, or any subsystem withmobile_credentials_enabled/mobile_access_enabled/ their_writetwins. - The mobile gateway never returns a credential value. It has no reveal route by design: entries cross the wire through an allowlist serializer, and a value can only be identified by its length and an on-demand fingerprint. Two further levers ship off —
mobile_creds_agent_readable_raise(raisingagent_readablefrom the phone) andmobile_access_global_scope(machine-wide access rules) — because each exceeds what a leaked Bearer token could otherwise reach. Deliberately absent from the surface: bulk.envimport, denial-counter clearing, any way to loosen or disable a built-in guard (v2.157.0 adds read, tighten and end-a-lease-early only), lock force-release, and the raw-content access preview. Since v2.157.0 (API version 7) the gateway also serves the cross-project views C3 Desk reads from the Hub (locks, Access Guard rules, tool discipline, override policy, built-in guards, the session catalog without transcript text, and a Now snapshot), so the companion app can show what Desk shows. - No telemetry by default. The OSS package collects nothing. Opt-in Sentry crash reporting requires the
[telemetry]extra plus bothSENTRY_DSNandC3_TELEMETRY_OPT_IN=1; even then request bodies, local variables, and prompts are stripped. - LLM memory distillation is local-first. Cloud distillation (v2.51.0) is off by default and opt-in per project.
- API keys for third-party providers are read from the environment and never persisted by C3.
- Full hardening guide and disclosure policy:
SECURITY.md
Support C3
C3 is free, open source, and built by one person. If it saves you tokens — that's the whole point — consider sponsoring on GitHub. Sponsorship funds API costs for cross-model test runs and dedicated development time.
License
Apache License 2.0 (LICENSE) — free for any use, including commercial. Third-party deps: THIRD_PARTY_LICENSES.md.
The author may introduce a paid offering or relicense future major versions; no commitment either way. Releases already published under Apache-2.0 (including all 2.x versions) keep that grant irrevocably. Background: LICENSING.md.
Links
Metadata
Release files for code-context-control 2.163.0
For a detailed explanation of source distributions (sdists) and built distributions (wheels), please see the package formats documentation.
Source distribution (sdist)
| File | Size | Uploaded | Provenance | Actions |
|---|---|---|---|---|
| code_context_control-2.163.0.tar.gz | 2.8 MB | With provenance | Details for code_context_control-2.163.0.tar.gz |
Built distribution (wheel)
| File | Interpreter | ABI | Platform | Actions Reset |
|---|---|---|---|---|
| code_context_control-2.163.0-py3-none-any.whl | Python 3 | none | any | Details for code_context_control-2.163.0-py3-none-any.whl |
Total release size: 5.1 MB
Release files / code_context_control-2.163.0.tar.gz
| Download URL | code_context_control-2.163.0.tar.gz |
|---|---|
| Size | 2.8 MB |
| Tags | Source |
|
SHA-256 checksum How to use checksums |
a6c941baf1aec7f342aef0abda80467c778aebd5d4779266d098e6501d492701
|
|
BLAKE2b-256 checksum How to use checksums |
dbbe69d0719142ff92f0609f0a0ce0013cb86b32096dfe00fe0adcfcd1ab990f
|
| Upload date | |
|
Uploaded using Trusted Publishing? What is trusted publishing? |
Yes |
| Uploaded via |
twine/7.0.0 CPython/3.13.16
|
Provenance
Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.
PyPI Publish Attestation
PyPI verified that this artifact, at this checksum, originated from the publisher listed below.
Signed by GitHub Actions, verified by PyPI on Nov 5, 2026.
Transparency logRelease files / code_context_control-2.163.0-py3-none-any.whl
| Download URL | code_context_control-2.163.0-py3-none-any.whl |
|---|---|
| Size | 2.3 MB |
| Tags | Python 3 |
|
SHA-256 checksum How to use checksums |
69dbdb36614e0e20f8f338beb2de3ed91a10db56b58c5ffb1123030a12572ee9
|
|
BLAKE2b-256 checksum How to use checksums |
6a19f566cfaac08fa8743528d6587cc375564bd377f9056b29fbe00776deae02
|
| Upload date | |
|
Uploaded using Trusted Publishing? What is trusted publishing? |
Yes |
| Uploaded via |
twine/7.0.0 CPython/3.13.16
|
Provenance
Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.
PyPI Publish Attestation
PyPI verified that this artifact, at this checksum, originated from the publisher listed below.
Signed by GitHub Actions, verified by PyPI on Nov 5, 2026.
Transparency logSecurity for code-context-control 2.163.0
Provenance
Provenance describes where a file came from. On PyPI, provenance is shared via attestations, which provide a verifiable record of the build or publishing details. View details, limitations and caveats.
Full provenance
Both files in this release have been uploaded with provenance metadata.
Attestation for code_context_control-2.163.0.tar.gz
PyPI Publish Attestation
PyPI verified that this artifact, at this checksum, originated from the publisher listed below.
Signed by GitHub Actions, verified by PyPI on Nov 5, 2026.
Transparency logA note on package security
PyPI is a repository for distributing packages, not a service for auditing them. While third-party security researchers and our staff do their best to detect and remove malicious packages, PyPI cannot guarantee the quality, security or suitability of any given package.
To learn more about protecting yourself from malicious actors, visit our package security documentation.