Skip to main content

Local MCP code-intelligence for AI coding tools: surgical search/read/edit, agent-config version history, path-level access + masking guards, and a multi-project hub.

Project description

Code Context Control

The local code-intelligence layer for AI coding tools.
Retrieve less, read less, edit safer — and control what an agent may read, write, or see.
Works with Claude Code, Codex, Copilot, Cursor, and Antigravity.

PyPI License: Apache-2.0 Python 3.10+ Platforms Status: Beta Sponsor

C3 per-project dashboard


The problem

LLM-driven coding tools have one expensive failure mode: they read too much. They cat whole files, regex the entire repo, dump 10k-line logs into context, edit-and-pray, and burn through budget before they touch a single line of code. On a half-day session you can spend $20+ on token waste that adds zero value.

And they read too widely: the same agent that greps your source also greps your .env, your customer CSV, and your production dumps.

What C3 does about it

A thin local layer between your IDE and your repo. Every AI tool call is routed through a narrow, surgical operation instead of a broad, wasteful one:

Without C3 With C3
Read the whole 2,000-line file c3_compress returns a structural map at 40-70% of the original token count → c3_read(symbols=...) for the exact function
Grep the whole repo blindly c3_search returns ranked candidates with TF-IDF + symbol awareness
Dump full pytest output into the prompt c3_filter distills 500 lines → 30 actionable ones
Edit, hope it compiled c3_edit writes via a ledger + c3_validate runs pyright/tsc automatically
Bash test runs that hang on Windows c3_shell returns structured {exit_code, stdout, stderr, duration} with auto-filter
Lose all context on /clear c3_session(snapshot) + c3_memory persist decisions across sessions
Re-explain the project every session Auto-synced CLAUDE.md / AGENTS.md / copilot-instructions.md from one source of truth
Agent reads .env, a customer CSV, a prod dump Access Guard denies the path outright, or Mask Guard serves a redacted view

Everything runs locally. No source code, prompts, or model output leaves your machine unless you explicitly opt into a third-party model API.


Install

Requires Python 3.10+. Recommended via pipx:

pipx install code-context-control
c3 init /path/to/your/project

Or pip install "code-context-control[tui]" for the optional Textual UI.

c3 init walks you through IDE selection (Claude Code, Codex CLI, VS Code, Cursor, Antigravity, or Custom), optional git init, MCP registration, and — for Claude Code — a permission tier. Headless:

c3 init /path/to/project --force --ide claude --mcp-mode direct --permissions standard
c3 init /path/to/huge-repo --force --no-embed     # skip the embedding index on large repos

Upgrade with c3 upgrade (or pipx upgrade code-context-control). MCP is wired through the c3-mcp entry point, so upgrading needs no per-project reconfiguration.

Upgrading from before v2.60.1 on Windows: existing projects are not repaired by upgrading — re-run c3 init once per project to fix hook registration.

Full notes: Upgrading · Contributing


The UI

Three local web apps, no Electron — pure Flask + vanilla JS: the Hub (c3 hub, port 3330), the per-project UI (c3 ui), and the optional Oracle (c3 oracle serve).

Project Hub — multi-project mission control

C3 Project Hub

Every C3-initialized project registers itself here on c3 init. Filter by active/idle, see IDE / version / port / last activity per row, and launch your IDE or the project UI in one click. Ctrl+K searches code and memory across every registered project.

Three top-level views — Projects, Tasks (a cross-project kanban), and Credentials — plus a drill-in panel per project covering Overview, Sub-projects, Tasks, Artifacts, Memory, Ledger, Sessions, Health, Budget, Credentials, Config, and MCP.

Sub-projects make a nested repo a first-class child with its own .c3: the parent's index excludes the child's subtree, and c3_search / c3_memory fan out on demand (scope='all', or one child by name). → Sub-projects guide

Per-project UI

c3 ui                             # binds the first free port from 3333

Twelve tabs. The dashboard above shows token savings, indexed files, the live session, and a stream of recent tool calls and file changes.

Tab What it's for
Dashboard Token savings, codebase breakdown, live session counters, recent activity
Chat Browse and search indexed IDE chat transcripts
Sessions Every session with duration, decisions, files, tool calls, token cost
Memory Durable facts across sessions — categories, semantic search, list ↔ graph
Tasks Per-project PM: dependencies, milestones, time tracking, health
Edits The Edit Ledger — every AI-driven change, versioned and restorable
Bitbucket PRs, branches, activity, admin against Bitbucket Data Center
Jira My Work board, JQL search, transitions, comments
Credentials Named secrets — metadata only, values are never returned to the browser
Access Guard Path rules: deny / read-only / mask, plus the path tester
Instructions One editor for CLAUDE.md, AGENTS.md, copilot-instructions.md
Settings Budgets, feature flags, background agents, delegate routing, MCP

C3 Tasks

Tasks (v2.45.0, extended v2.53.0) is a durable per-project tracker — dependencies and subtasks, milestones, decision notes, full event history, health reports, and both automatic and manual time tracking. It rolls up into the Hub's cross-project board.

Instructions keeps your agent-facing docs in sync. C3-generated content sits inside a <!-- C3:BEGIN … --> block; anything you write outside it is preserved. Since v2.60.0 generated docs point at .c3/MAP.md — a machine-owned, byte-stable repo map C3 refreshes automatically — instead of embedding a tree that goes stale. AGENTS.md serves both Codex and Antigravity; GEMINI.md is read if present but no longer generated (the Gemini CLI profile was removed in v2.52).


The MCP tool suite

C3 exposes 20 tools as a native MCP server. Your IDE calls them directly:

Tool What it does
c3_search TF-IDF / regex / semantic search, ranked; fans out to sub-projects with scope=
c3_compress AST-based file map (map, dense_map, smart, diff, bug_scan, ast)
c3_read Surgical reads — by symbol name, regex, or line ranges
c3_edit Atomic patch with ledger logging + content-addressable history
c3_validate Type / syntax check (pyright, tsc, ruff — auto-detected)
c3_filter Distill long terminal/log output via pattern + LLM summarization
c3_shell Shell commands with structured returns + auto-filtered stdout
c3_status Views: budget, health, notifications, sessions, ghost_files, access
c3_memory Fact store with categories, recall, graph queries, indexfetch two-step
c3_session Snapshot, restore, log decisions, compact history
c3_impact Blast-radius analysis before editing shared symbols
c3_delegate Offload heavy work to local Ollama / Codex / Gemini
c3_agent Workflows: review_changes, investigate, preflight, prepare_context, validate_compress
c3_edits Edit-ledger queries, version diffs, restore points, per-branch filter
c3_task Per-project PM — tasks, dependencies, milestones, time tracking (v2.53.0)
c3_artifacts Agent-config version history, diff & restore (v2.46.0)
c3_credentials Named-secret vault; values never enter model context (v2.58.0)
c3_bitbucket Bitbucket Data Center — PRs, branches, builds, admin (v2.30.0)
c3_jira Jira Cloud + Data Center — JQL, issues, transitions (v2.56.0)
c3_project Cross-project discovery & operations; guarded writes (v2.31.0)

Every tool is read-only safe in plan mode except c3_edit, c3_shell, c3_artifacts(action='restore'), c3_delegate with write delegation enabled, and write actions on c3_bitbucket / c3_jira / c3_credentials / c3_project / c3_task.

On Windows c3_shell uses Git Bash when available. Git Bash bundles no jq; use python -m json.tool for portable JSON formatting.


Guards — what the agent may touch, and what it sees

C3 Access Guard and Mask Guard

Two questions, two answers. Access Guard (v2.62.0) answers may the agent touch this path? Mask Guard (v2.63.0) answers what should it see when it does?

c3 access add "secrets/**" --kind deny          # never read, never write
c3 access add "migrations/**" --kind read_only  # readable, never written
c3 access mask add "data/*.csv" --preset sample_rows --params "count=20,strategy=first"
c3 access mask activate                         # purge pre-mask artifacts, build views
- AWS_KEY = "AKIAIOSFODNN7EXAMPLE"          # your file
+ AWS_KEY = "«c3:redacted:aws_access_key»"  # what the agent sees
  • Tighten-only. No allow list exists; global and project scopes merge as a union, so a cloned repo's config can only add protection.
  • deny means deny-enumerate too — denied paths never appear in search results, maps, or the vector index.
  • Masked means read-only, always. Cropped rows have no inverse, so an edit in transformed coordinates would corrupt the one file you protected.
  • Four deterministic presets, no LLM in the read path: redact_secrets, redact_columns (salted one-way pseudonyms — joins survive, no reverse dictionary), sample_rows, signatures_only.
  • Rule changes are human-only (UI tab or CLI) and ledger-logged. Agents have no mutation surface.
  • Honest coverage. This guards cooperative agents against mistakes and prompt injection. It is not a sandbox — a raw shell outside C3's tools still sees the real bytes.

Access Guard · Mask Guard


Integrations

What you get Guide
Credential vault (v2.58.0) Named secrets, global + per-project, in the OS keyring. Agents use them by name — env_creds='NPM_TOKEN' or {{cred:NAME}} — and values are decoded only at the subprocess boundary, never in model context. Hub-wide Credentials view since v2.59.0. guide
Bitbucket DC/Server (v2.30.0) PRs, branches, builds, repo admin over REST + PAT. Merges and branch deletes land in the edit ledger. guide
Jira (v2.56.0) Cloud (REST v3) and Data Center (REST v2) behind one tool: raw JQL, My Work board, transitions, comments, and an Activity view linking ledger work to issue keys. guide
Oracle Discovery API (v2.32.0) Expose cross-project code + memory intelligence as tools for an external LLM, over MCP (:3332/mcp) or OpenAPI REST (:3331/api/discovery). Read + safe-action tools only, Bearer token in the keyring. guide

All tokens live in the OS keyring (Windows Credential Manager, macOS Keychain, Linux Secret Service) — never in .c3/config.json. Each supports login --global so one login is reusable across every C3 project.


Tiered local AI (optional)

Optional Ollama integration so the primary model doesn't spend context on grunt work:

Tier Model class Used for Latency target
Nano qwen2:0.5b Intent routing, classification <100 ms
Micro deepseek-r1:1.5b Last-turn Q&A, summarization <1 s
Base llama3.2:3b+ Code analysis, technical reasoning <5 s
c3_delegate(task="summarize this 4k-line stacktrace", backend="ollama")
c3_delegate(task="rate-limit refactor", backend="auto")    # picks the right tier

Ollama is fully optional. C3 works without it.


Permissions (Claude Code)

C3 manages .claude/settings.local.json with three tiers:

Tier What it allows
read-only Exploration only — no file writes, no git writes, no installs
standard Normal dev workflow — edit, build, test, local git (recommended)
permissive Full trust — everything except destructive ops
c3 permissions show
c3 permissions standard

All tiers allow C3's MCP tools and include a hard deny list (rm -rf, sudo, git push --force). Switching a tier preserves your own allow/deny rules — only C3-managed entries are replaced. The same applies to .mcp.json and your hooks.


Benchmarks

Every number C3 advertises is reproducible on your own machine, against your own project:

c3 bench session                  # six realistic workflow scenarios, A/B with vs without C3
c3 benchmark /path/to/project     # per-operation micro-benchmarks
c3 bench aider                    # Aider Polyglot suite (external; burns real API tokens)
c3 bench swe                      # SWE-bench Lite (external)

The session benchmark's baseline models a competent agent working without C3 — one targeted search, each file read once — and scores answer quality alongside tokens. Runs against C3's own repository land around ~50% token savings (2×) at quality parity — 51.8% at v2.43.0, 49.9% at v2.63.2, with C3 scoring 98.8% on answer quality against the baseline's 96.5% in both. File sampling is deterministic (largest files first, no RNG), so a given commit reproduces the same figure. Your numbers will differ with your project's shape; that's why the harness ships with the tool.

C3 also records real per-tool usage to .c3/tool_telemetry.jsonl, so estimates can be checked against what actually happened.


Security & privacy

  • All web servers bind 127.0.0.1 by default and are guarded against browser-based attacks even on loopback — a Host-header allowlist (defeats DNS rebinding) plus an Origin/Referer check on every request (defeats cross-origin CSRF), with scoped, non-wildcard CORS. There is still no user authentication, so do not expose these servers to an untrusted network without auth/TLS in front. Binding to a non-loopback interface is opt-in and warned at startup. (Hardening added in v2.33.0.)
  • No telemetry by default. The OSS package collects nothing. Opt-in Sentry crash reporting requires the [telemetry] extra plus both SENTRY_DSN and C3_TELEMETRY_OPT_IN=1; even then request bodies, local variables, and prompts are stripped.
  • LLM memory distillation is local-first. Cloud distillation (v2.51.0) is off by default and opt-in per project.
  • API keys for third-party providers are read from the environment and never persisted by C3.
  • Full hardening guide and disclosure policy: SECURITY.md

Support C3

C3 is free, open source, and built by one person. If it saves you tokens — that's the whole point — consider sponsoring on GitHub. Sponsorship funds API costs for cross-model test runs and dedicated development time.

License

Apache License 2.0 (LICENSE) — free for any use, including commercial. Third-party deps: THIRD_PARTY_LICENSES.md.

The author may introduce a paid offering or relicense future major versions; no commitment either way. Releases already published under Apache-2.0 (including all 2.x versions) keep that grant irrevocably. Background: LICENSING.md.

Links

Project details


Download files

Download the file for your platform. If you're not sure which to choose, learn more about installing packages.

Source Distribution

code_context_control-2.63.2.tar.gz (1.4 MB view details)

Uploaded Source

Built Distribution

If you're not sure about the file name format, learn more about wheel file names.

code_context_control-2.63.2-py3-none-any.whl (1.4 MB view details)

Uploaded Python 3

File details

Details for the file code_context_control-2.63.2.tar.gz.

File metadata

  • Download URL: code_context_control-2.63.2.tar.gz
  • Upload date:
  • Size: 1.4 MB
  • Tags: Source
  • Uploaded using Trusted Publishing? Yes
  • Uploaded via: twine/6.1.0 CPython/3.13.14

File hashes

Hashes for code_context_control-2.63.2.tar.gz
Algorithm Hash digest
SHA256 6ba0e830d10d6cdf6aba46a90ac80ebffcf3a40687cec15504807729895ed1de
MD5 a8e121e7b09adde4f6ebf188ad0560e2
BLAKE2b-256 10495c6c98b578aaf275a1782c3b8eb77115037b6512e1d56a43ba7bfe4b09c5

See more details on using hashes here.

Provenance

The following attestation bundles were made for code_context_control-2.63.2.tar.gz:

Publisher: release.yml on drknowhow/code-context-control

Attestations: Values shown here reflect the state when the release was signed and may no longer be current.

File details

Details for the file code_context_control-2.63.2-py3-none-any.whl.

File metadata

File hashes

Hashes for code_context_control-2.63.2-py3-none-any.whl
Algorithm Hash digest
SHA256 7634b9b7952d54e27e96cd0e0013199e696b4bcec11ef64f7e6203c1e571cb2f
MD5 e087250711858f30329f508b91fa6152
BLAKE2b-256 6670c667cc795a85827c75c7c4cd9c6e3fa1508ffdc76a8f8b2f9b0ea03a44f9

See more details on using hashes here.

Provenance

The following attestation bundles were made for code_context_control-2.63.2-py3-none-any.whl:

Publisher: release.yml on drknowhow/code-context-control

Attestations: Values shown here reflect the state when the release was signed and may no longer be current.

Supported by

AWS Cloud computing and Security Sponsor Datadog Monitoring Depot Continuous Integration Fastly CDN Google Download Analytics Pingdom Monitoring Sentry Error logging StatusPage Status page